In the already formed new building house, surrounded by forest, sold PFLP APDAILA Two-storey, 127 sq. m double-storey houses are installed, located only through technical premises.
House installation has already been started, paving heating system has been started, interior finishing work is being carried out. End of July 2026
The project was created by carefully considering each detail so that your daily life is comfortable and harmonious.
• The neighbourhood is already inhabited, most of the newcomers are young families. To the house leads an asphalted road, lit access, the telefax has been opened.
• Planning that will meet the expectations of a large family or looking for space: large (46 sq. m. (m) a living room, provided for a working room, on the second floor 3 bedrooms, one with private bathroom and wardrobe, a spacious boiler house suitable for storage of items.
• The wooden terraces are located in a western direction - the ideal place to meet the sunset and relax after day's concerns.
• Modern home architecture, coincident roofs, facade decorated with clinker tiles and especially large windows to the ground in all premises.
• Full finishing includes: interior finishing, lighting, heating and recuperative systems with equipment, bathrooms. The electric car charging station and solar power plant have been installed.
• Each house has a fenced courtyard of ~ 4 ares, a levelled plot, trunks, 2-3 parking places.
_ _ _ _ _ _ _ _
GENERAL
• Address: Grendavės g. 40, Higher Paneriai, Vilnius
• Design area: 127,71 sq.m
• Price with full finish: 325 000 Eur
• The area of the plot: for a house under ~ 4.07 a
• Number of rooms: 5 (living room and kitchen area, working room, 3 bedrooms)
• High: 2
• Building type:
• EN Class: A + +
• Year of construction: 2026. Complete finishing work until July 2026
COMMUNICATION
• Electrical: equipped rosettes, switches
• Heating: floor, system oro-water, heat pump "GREE Versati" (8 kW), with integrated 185 L boiler
• Ventilation: equipped with recuperation, recuperator "Komfovent Domekt"
• Water supply: local (well), provides 2 double houses
• Sewerage: local, individual cleaning plant "Šrukė" for every apartment
• Lighting: LED lights, LED lights
• A rainwater collection system is installed.
• Introduction for electric car charging station and solar power plant
• Optical Internet: Opened
• Fire safety installed
CONSTRUCTION MATERIALS, INSTALLATION
• Foundation: Polar drilled rostverk, heated with foam polystyrene (10 cm from the bottom, 10 cm from the inside, 20 cm from the outside)
• Wall: carved from ceramic blocks KERATEM Premium (25 cm), heated with 25 cm neoporu
• Facade finish: decorative plaster and clinker tiles
• Partitions / internal walls: I floor ceramic blocks (12 cm), 2nd floor - double gk partitions
• Roof: gb overlay plate, heated with 35 cm of foam polystyrene plate (EPS 80 N), coated with bitumen coating (two layers)
• Floors: I floor insulated foam polystyrene (20 cm), second floor - 5 cm
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
• Wall: painted. San. in nodes - tiles
• Floor: laminate, optional vinyl. San. in nodes - tiles
• Lacks: flexible, optional gypsum cardboard, recess curtains with LED illumination
• Stairs: monolithic concrete staircase construction, with tiered finish
• Interior doors: MDF / wood veneers
• Windows: Rehau, plastic, 3 glass package, 6 cameras, corresponding to A + +
• Outdoor doors: armour type, corresponding to A + + class, metal with glass package. Outdoor boiler house doors - armor type
• Bathroom: equipped with sanitary equipment (washers with lockers, thermostatic mixers "Air," shower, bath, suspended toilet, mirror with lighting)
• A rustic about the house: levelling up the terrain, laying the stones, distributing the land
• Terrace: drilled, ground, wooden (pine), ~ 3x6 m
• The fence is surrounded by the territory of the plot and the separate houses
CONTACT
The new building house is comfortable, quiet and full of positive newcomers energy, surrounded by Dirkkiškės forest. Pedestrian access to the most important infrastructure, shop, public transport stop, catering facilities. To the house leads asphalted access, lit streets, nearby large supermarkets, educational institutions, and to the city center only 20 minutes by car
• 1 km / 2 min to store RIMI
• 1.9 km / 4 minutes to shop HERA MARKET
• 1,2 km to the nearest public transport stop "Bališkės"
• 0,75 km / 2 min to pizzerias, "Bon Pizza"
• 2 km / 4 min. to the cradle - kindergarten, Kalvu kites
• 4.9 km / 8 minutes to Lentvaris primary school
• 9 km / 12 min to Trakai Vokė gymnasium
• 14,7 km / 20 min to the city center (Lukiškių square) You can find all the latest CAPITAL real estate ads on our website www.capital.lt. Please visit!