A modern club house in a prestigious coastal area is a format that is chosen not by price, but by standard of living. A small, chamber project in a closed area is created for those who want to live beautifully, calmly and without compromise.
The architecture, with an emphasis on geometry, natural shades and evening lighting, forms a sense of private residence rather than mass development. Everything here is thought out to the details - from engineering to scenarios of everyday life.
Chamber format - one block, a limited number of apartments
Closed area with access control and video surveillance
Underground parking + electric vehicle charging station
Open swimming pool in private interior space
Premium engineering solutions: central water treatment system, hydrophore, satellite system
Smart home, warm floors, air conditioning, built-in equipment
Location: walking access to the promenade, shopping center, schools and beaches
The format – “closed the door and live”, without too much noise and neighbors.
The project offers several types of apartments – from compact residences to spacious family formats and duplexes.
Total area: ~38.5 m2
Ideal for a single person, couple or rental investment.
Total area: 55–64 m2
Balcony or own garden (on the first floors)
Functional layouts without unnecessary corridors, with clear zoning of the day and private part.
Total area: ~105 m2
Kitchen-living room
3 bedrooms
3 bathrooms
Terrace and balcony
A format for a family that wants maximum space, privacy and a sense of “home”, not an apartment.
Built-in kitchen with appliances
Designer bathrooms of Hilton format
Scenario LED lighting
Wardrobes and storage systems
Embankment - 400m
Shopping center - 500 m
Beaches - 1-5 km
Schools, hospitals, sports - within a radius of 1 km
Airport - 14 km
This is a rare combination of the quietness of a residential neighborhood and a full urban infrastructure.
To live by the sea without tourist chaos
For those looking for a premium level in a compact format
Investors who care about liquidity and demand
The completion date is March 2027.
Watch the video review
Watch video review 2