An outlet for connecting photovoltaics from the ground floor to the roof is installed, each house has a chimney for installing a fireplace on the ground floor. Heating is provided by a heat pump with a system of heated floors, water from its own source. All communications are brought to the attic for the installation of an additional bathroom, a treatment plant is provided.
Entrance gates are remote controlled, an intercom is installed. There is no common management company.
The building is insulated with 20 cm thick graphite polystyrene foam, from the forest side - 20 cm mineral wool, the attic is insulated with 25 cm Soudal foam. The fence from Modlińska Street is made of concrete, the rest of the areas - aesthetic mesh.
The windows are plastic, triple glazed, burglar-proof on the ground floor, the entrance door is also burglar-proof.
Each house includes two parking spaces in the price.
Completion of construction and handover of keys is scheduled for September 2025.
Layout: on the ground floor entrance hall 1.64 m², corridor 4.06 m², living room with kitchen 20.30 m², room 8.00 m², bathroom 5.16 m², storage room 1.50 m², staircase 4.48 m², total 45.16 m²; on the second floor corridor 2.31 m², room 22.16 m², room 9.65 m², bathroom 5.09 m², total 39.21 m²; third floor - recreation area 41.18 m².
Full ownership with KW, possible purchase using a loan.
]]>