New residential complex in Varna, 400 meters from the sandy beaches of Kabakum and Sunny Day
Location
The building of the complex is located in the area of Alain Mak, just a 15-minute walk to Kabakum beach and 15 minutes by car to the city center. This provides future residents with quick and hassle-free access to the diversity of the big city and the wonderful beaches of Kabakum or Sunny Day, as well as a great opportunity to enjoy the sea breeze away from the city noise.
Description of the complex
Two-section 4-storey open-type house with ground and underground parking, a playground and its own year-round heated pool.
A closed area with round-the-clock security and video surveillance guarantees peace and privacy, creating ideal conditions for living outside the city.
The backyard will have its own outdoor heated pool, available all year round.
The apartments have their own terraces and patio areas for the rest of the family.
Each apartment is thought out to the smallest details: the interiors correspond to modern trends, and the spacious terraces and green courtyards will become a place for relaxation and inspiration.
This project combines comfort and style, offering apartments with thoughtful interiors, spacious terraces and green courtyards.
The apartments will be rented on a rough finish with the possibility of turnkey delivery and with the possibility of full furniture.
Construction characteristics
Construction class: Comfort+,
Foundation: Monolithic reinforced concrete,
Construction: Monolithic reinforced concrete,
Exterior walls: Ceramic brick "Winerberger" Porotherm 250 mm,
Facade insulation: Styrofoam.
Facade: system "wet facade", finish coating with silicone paint.
Windows: PVC five-chamber profile with single-chamber energy-saving glazing.
Paul: Cement-sand screed.
Ceiling: plaster or cement plaster.
Individual electricity and water meters and plots.
Heating system: electric air conditioning, electric floor heating.
Ceiling height: 1-3 floor -2.70 m, 4 floor - 2.60 m.
Duration of construction
Start of construction: February 2025.
End of construction: July 2027.
Commission from the buyer: 3%