A newly built residential complex in the city of Burgas, in a residential complex. Slaveykov
Location
The new building is being built next to Green Park 1, in close proximity to the Lidl store in the residential area of Slaveykov, next to the main transport arteries in the direction of the city center, the Sunny Beach resort, Sozopol and the highway to Sofia, as well as not far from the shopping centers «Gallery» and «Plaza». There are also many schools, kindergartens, medical centers, bank branches, shops, establishments, and bus stops in the area.
Property description
The building consists of solar apartments – functional two-room and three-room, with shops, underground and above-ground parking spaces and garages.
Construction characteristics
Facades:
External walls: brick 25cm;
Insulation of brick walls with 10 cm foam – Baumit;
Facade mesh covered with glue – Baumit;
Structural polymer plaster – Baumit;
Thermal insulation on concrete surfaces – XPS 10cm.
Common parts:
Staircase and common parts: granite tiles;
Walls and ceilings: plaster putty and latex;
Railing - by design;
Hydraulic lifts installed;
Apartments (bedrooms, kitchens, dining rooms, living rooms and corridors):
Walls and ceilings: plastered with plaster plaster with aluminium corner profiles for plaster;
Floors: cement screed;
Wet rooms: lime-cement plaster; floor-cement screed.
Balconies
Walls and ceilings with facade plaster, with installed lamps;
Floor: waterproofing and granite tiles;
Railing according to the project.
Windows: Five-chamber windows with energy-saving double-glazed windows «4 seasons»;
Natural stone window sills.
Doors: Anti-breaking apartment entrance doors;
Polypropylene water pipes /reinforced and insulated/.
Electrical installation
A high-current electrical installation for lighting and sockets was built;
Electricity meters installed;
Apartment electrical panel;
Switches and sockets installed;
Installed lamps on balconies;
Installing a bell and intercom;
Internal installations for telephone, Internet and television.
Parking spaces and garages
Walls and ceilings: executed according to design;
Floor: polished concrete.
The price of above-ground parking space is from 9,000 euros, underground parking spaces - from 12,000 euros.
Construction deadlines
Construction begins in September 2023.
Construction period is 20 months.
February 2024: construction reached 3 floors.
Payment scheme
Standard.
Flexible payment schemes are possible depending on the client’s wishes.
No support fee in the building.
Commission from the buyer: 3%