A house with a plot in the prestigious garden community "Lake Coast" next to a forest and the Vyacha River. Just 18 km from the Moscow Ring Road. Get the opportunity to do the finishing work to your own taste! The house is technically completely ready. The work was carried out taking into account all construction standards, everything was thought out to the smallest detail. Ready design project. All that remains for you is to complement it with your own interior solutions and choose your favorite colors, textures and pieces of furniture. 1) A plot of 15 acres, regular shape, leveled, privately owned. The plot has: - garage 8.79 x 10.58. Separate entrance, 2 parking spaces, electric roller shutters. drives Hormann (Germany). The inside is plastered, the outside is finished with bark beetle, the power supply is 3-phase; - a foundation for a bathhouse and a gazebo with utilities (water, electricity). 2) Block house 324 m2, frameless, two-story, has three levels. Wall material – gas silicate blocks 0.4 m, 3 monolithic belts. The outside is insulated with slabs of min. “Facade” cotton wool, 50 mm thick, with bark beetle applied.The thermal resistance coefficient is 3.97 – (the norm in the Republic of Belarus is 3.2). The ceiling is insulated with non-combustible Rockwool insulation 0.3 m thick, the thermal resistance coefficient of the ceiling is 6.7 (the norm in the Republic of Belarus is 6.0). 3) The project (1st and 2nd floor) includes 5 living rooms, a living room of 34.5 m2 with an adjacent kitchen of 19.5 m2 and two separate bathrooms. 4) Technical part. - The walls are leveled for painting, all installations are displayed in the bathrooms, pipes are installed in accordance with the project. The floors are laid out for laying tiles or parquet boards. - Waterproofing and insulation of the basement: mastic and polystyrene slabs 50 mm (outside); waterproofing of the floor - "TechnoNIKOL", adjoining to the foundation blocks was carried out with Remmers compound (inside). The floor is insulated with 50 mm polystyrene slabs followed by a finishing concrete screed. - The roof is made of IKO bitumen tiles (Belgium), with Armourbase lining carpet. - Gas heating. Gas is supplied to the house using copper pipes. The combustion chamber has been in operation for 3 years. A gas cast iron boiler Buderus Logano g124 ws – 28 kW with an indirect heating boiler of 160 liters was installed. (Germany).Automation Logamatic RC-310 with a module for online control of EMS KM 200 automation. Heating includes: Kan-Therm heated floors. 2) Kermi VK-Profil radiators, with thermal heads. - Water supply. Well, installed comb with wiring throughout the house, input and distribution are made of stainless steel with bypass and filter. - Local sewerage, 2 wells with 3 rings. A water seal has been installed on the boiler. - Internet – fiber optic, supplied to the house. A video surveillance system has been installed. Low-current systems are combined into a separate cabinet (Rak), installed in the technical area. indoors. - Electricity ~380 V, cable lines were laid out point by point (open and corrugated), without installing sockets. The ground loop has been laid (measurements have been taken). 5) Building materials remain: Nelissen drainpipes (Slovakia), fertile soil 60 m2 and crushed stone for backfilling 25 m3. Net sale! Call! Agreement number with the agency 137/1 dated 2023-02-27
Posted at: 01/07/2024
Updated at: 01/07/2024