This is one of 58 villas which is planned to be built in this project. Except for residential part, there will be:
And the greatest about this project is location. Slight hill elevation allows to get panoramic views out of each villa and enjoy the natural air flow.
The houses are expected to be built in 2025 (18 months).
It will consist of 4 (or rather 3,5 stories). There is an elevator connecting all floors.
Mezzanine floor:
1st floor:
2nd floor:
3rd floor:
There are smaller villas available at this project, with 3 bedrooms.
Location:
Payment terms: