The proposed house is three storeys. On the ground floor we have a living room of over 40m2, a kitchenette, a pantry and a toilet. On the first floor, the private part is the master bedroom with dressing room, a room, a bathroom and a technical room.
The third floor includes two more bedrooms, a bathroom and a large terrace of over 12m2.
The house is 164,33m2 of usable area and 178,55m2 of total area. The plot size is 213m2.
We also offer you the opportunity to take advantage of the service of the Interior Finishing of the house. There is our Architect available, who will prepare a project, make visualisations of the rooms based on your preferences. The finished project will be carried out under the supervision of the designer by a proven team, and the finished house will only require you to bring in your luggage.
THE RESIDENCE:
This is a small estate of houses in the form of urban villas. Houses with garages, with terraces or with gardens on the roofs. There is space in front of the house for a second car, and some of the houses also have space for a third car. A total of 29 houses have been designed. Their areas range from 128 to 220 m2. There are 6 or even 7 rooms. The plots of land for the houses range from 211 to 588 m2.
The estate is accessed by a cobblestone road, each house is heated by an air source heat pump, has recuperation installed and the possibility of connecting photovoltaic panels and electric car chargers. There is underfloor heating throughout. The exposure of each is east and west, with the extreme ones also south.
LOCATION:
The estate is located in the centre of a low-rise development right on the border of Warsaw Ursynów. In the immediate vicinity you will find shops, a shopping centre, schools, kindergartens and a swimming pool nearby. The place is close to Kabaty Forest, which can be reached on foot or by bike in several minutes. Nearby also an international school, a fitness school, a pharmacy or restaurants and cafes. If you use city buses, you can reach the bus stop in the direction of Warsaw in a few minutes (e.g. 709, 739 and others). At the same time, it takes only a few minutes to drive to the S7 route in the direction of Cracow or to the capital city to Okęcie airport.
The house will be ready in the third quarter of 2025. Developer standard with the possibility of turnkey interior finishing.