A plot of land is for sale with a permit obtained for the construction of a 7 MW solar power plant. 100% private property (legal entity). All necessary documentation has been received and agreed upon (this includes contractors and construction costs); if purchased, construction can begin immediately. The price of 7.3 million euros includes land with accompanying design documentation and the construction of the facility itself. The entire construction process, complete works and materials/pre-construction work, Tier1 quality fn modules, all DC and AC cables, low and medium voltage substations are included in the price - until the issuance of a use permit with a paid connection of the kit to the HEP ODS. The cost of the station is subsidized by HROTE (Croatian energy market operator) if the application is submitted before 06/27/2024.
In total, we have 20 solar power plants, both ready to build (RTB) and operating power plants. As well as projects for development from 0.
*The service for developing a solar energy project from scratch is available, from obtaining a location to launching a power plant, as well as installing and launching batteries for storing BESS and more profitable sales of electricity.
Information about this property may have changed and we cannot be held responsible for its accuracy. For exact specifications please contact us. The photographs are symbolic. persons chrome extension:// efaidnbmnnnibpcajpcglclefindmkaj/https:// rudalle.ru/media/License_ru.pdf. Copying, reproduction, distribution, reprint (in whole or in part), or other use of the material without the written permission of the author is not permitted. Any violation of the author's rights will be prosecuted on the basis of international law.