Newly built residential complex in Burgas, Izgrev district
Location
The complex is being built in a new extension of the Izgrev district of the city of Burgas. In close proximity to the Metro hypermarket, Plaza Mall, Kaufland and Lidl supermarkets. Fast and convenient access to the main road arteries, a completely new infrastructure, a high level of comfort for residents, green spaces.
Description of the complex
The complex consists of functional apartments with one and two bedrooms, ground and underground parking spaces.
The apartments are rented on a rough finish.
parkomesta
External parking space: from 13,000 euros
Underground parking space: from 17,000 euros
Garages: from 24,000 euros
Construction characteristics
High-quality construction:
Stairs and common areas: granite tiles;
Walls and ceilings: plaster plaster and latex;
The railing according to the project;
ORONA hydraulic elevators;
Rooms (bedrooms, kitchens, dining rooms, living rooms and corridors)
Walls and ceilings: plaster plaster with aluminum angular profiles;
Floors: cement screed;
Bathrooms: lime and cement plaster; floor: cement screed;
Balconies
Walls and ceilings with facade plaster and installed lamps;
Sex: granite tiles;
Parapet according to the project;
Five-fold energy-efficient window "4 seasons";
Doors.
Entrance doors to the apartment with protection from burglary;
Water sanitation
Polypropylene pipes /reinforced and insulated / on the "fork";
Electrical installation
Built-in high-voltage electrical wiring for lighting and outlets;
Installation of electric meters;
Electrical shield of apartments;
Installation of switches and sockets;
Installation of lamps on balconies;
Installation of the call and intercom;
Internal communications for telephone, Internet and television;
Heating, Ventilation and Air Conditioning (HVAC)
Completed in accordance with the project.
Parking spaces
Walls and ceilings: made according to the project;
Floor: polished concrete;
Facades
External walls: Wienerberger brick or similar;
Thermal insulation of brick walls with polystyrene foam coating EPS 10 cm - Baumit;
Facade mesh, plastered with glue - Baumit;
Structural polymer plaster - Baumit;
Heat insulation of concrete surfaces - XPS 10 cm
No support tax in the building
Payment scheme
- Deposit: 2,000 euros
-30% - when signing a preliminary contract;
-15% - when reaching the level of the cap (cat 0.00)
-15% - when reaching level 5 floor
-15% upon receipt of Act 14
-20% upon receipt of Act 15
-5% upon receipt of Act 16
Duration of construction
Start of construction: March 2026
Completion time: 24 months
Commission from the buyer: 3%