SOLAR POWER PLANT, BOSNIA

Bosnia and Herzegovina, Trebinje
€18,00M
€12/m²
;

Location

  • Country
    Bosnia and Herzegovina
  • State
    Republika Srpska
  • Region
    City of Trebinje
  • City
    Trebinje
  • Address
    Podkula

Property characteristics

Property parameters

  • Price per m²
    Price per m²
    €12/m²
  • Total area
    Total area
    1 500 000 m²

Description

Ready-made project with a building permit from the state of Bosnia and Herzegovina for the construction of a solar park with a capacity of 100 MW.  There is permission to connect to three power lines going to Hungary from a plot of 1,500,000 m2, which they receive for 30 years. This price includes rent for the premises for a period of 30 years. The investor buys a transformer substation and panels, all projects are completed and everything is ready to start investing. All developments and permits are ready. Three power transmission lines (100, 220 and 300 kV) pass through the place where the solar park will be built, so the connection and installation of the future location for the transformer substation is the investor’s choice. The territory and the solar park are provided with technical specifications (urban planning technical conditions), as well as a building permit. To obtain a building permit, the investor only needs to specify the type of solar panels, and the process takes about 45 more days to obtain 100% building permit. The location occupies an area of 1,500,000 m2, connected by two regional directions and local roads. The configuration of the land plot is very favorable, there is no groundwater, the site load exceeds 75%, with a lot of sunny days. (There are completed studies and analyzes with videos of the site itself that can be provided after investor interest). About 80% of the total area is privately owned, and 20% belongs to the state. The entire site can be leased for 30 years with an option to extend for a further 30 years. The approximate period for preparing and leveling the site is about 30 days, the same amount of time is needed to ensure the transfer of administrative documentation of the new property (notarial agreements and agreements with the state, as well as land lease agreements, etc.). The price includes the connection fee for the electrical network, amounting to 1,250,000 euros, and the cost of renting the premises for 30 years, amounting to 3,000,000 euros/30 years. The new investor must additionally invest in a transformer substation and solar panels, and also participate in the construction of a solar park. The annual government rebate for electricity produced by the Solar Park is 0.03 euros/kilowatt.

*The service for developing a solar energy project from scratch is available, from obtaining a location to launching a power plant, as well as installing and launching batteries for storing BESS and more profitable sales of electricity.

Information about this property may have changed and we cannot be held responsible for its accuracy. For exact specifications please contact us. The photographs are symbolic. lic chrome extension:// efaidnbmnnnibpcajpcglclefindmkaj/https:// rudalle.ru/media/License_ru.pdf.  Copying, reproduction, distribution, reprint (in whole or in part), or other use of the material without the written permission of the author is not permitted. Any violation of the author's rights will be prosecuted on the basis of international law.

Updated at: 18/12/2024

Location on the map

Bosnia and Herzegovina, Trebinje
Ask all your questions
Send your request to the agent
Thank you! Your request has been accepted
I want to view this property. Is the price of the property relevant? I want more information about the property. What are the purchase conditions for foreigners? I want to see more photos/videos. Is it possible to buy with a loan/mortgage? Will I get a residence permit if I buy a property?
Back Leave a request Call
Similar properties
No similar properties in Bosnia and Herzegovina were found. Use extended search