The object code in the Agency's database: 168-117, Kaluga highway, 5 km from MKAD, Filatov Lug k/p (Zimenki). A custom-made house, modern architecture, ready for finishing (partially turnkey), in a guarded, intimate village. The bathrooms are finished with large-format porcelain tiles, multi-level ceilings are made, all communications are laid out to the points, the boiler room is fully equipped with German equipment. The house has high ceilings, two bedrooms on the ground floor, a billiard room, a hammam, preparation for a double-sided fireplace, a large covered terrace. Excellent transport accessibility by car (two highways, only 5 km from MKAD. 12 min walk to the metro). Type of development: inhabited k/p. House area 510 sq.m., plot area 15 acres. Stage of readiness: ready for finishing. Bedrooms: 6. partially turnkey. Bathrooms: 4. Total number of rooms: 9. Important options: staff apartment; covered terrace; fireplace (provision for double-sided bio-fireplace); covered parking spaces: 2; provision for hammam. Windows: wooden double-glazed windows (double-chamber, dark brown REHAU profile). Year of construction: 2020.Roof: metal tiles (Drainage system "HUNTER" dark brown).
1st floor: vestibule 6.8 sq.m, dressing room 10 sq.m, storage room 1.8 sq.m, laundry room 6 sq.m, guest bedroom 15 sq.m, bedroom 26.6 sq.m, hall 35 sq.m, bathroom 3 sq.m, kitchen 29 sq.m, dining room 44 sq.m, living room 39 sq.m, bathroom 1.5 sq.m, dressing room 15 sq.m, covered terrace 79 sq.m.
2nd floor: hall 16 sq.m, bathroom 11 sq.m, two bedrooms of 21 sq.m, bathroom 12 sq.m, bedroom 20.8 sq.m, dressing room 17 sq.m, bedroom 24.4 sq.m, bathroom 7 sq.m, dressing room 11 sq.m, balcony 7 sq.m. Interior decoration: neoclassicism (pre-finishing), some bathrooms are turnkey finished (facing with porcelain stoneware) and the boiler room, and the staff apartment is furnished. The staircase is 118 cm wide and made of monolithic reinforced concrete grade B25. Engineering support: all communications are fully installed throughout the house - electricity, heating, heated floors, water, sewerage. Preparation for electrical installation has been completed. A Buderus 100 kW boiler and a Buderus 300 l indirect heating boiler were installed.Multi-stage water purification system - coarse filters and fine filters. Landscaping: lawn on the plot, drainage along the house and on the plot. \nLand status: for private farming. Additional buildings: Garage with staff apartment 100 sq.m:
1st floor: garage for 2 cars 58 sq.m, boiler room 17 sq.m;
2nd floor: staff studio apartment 25 sq.m. Utilities:
gas - available (gas tank, possible connection to main gas),
electricity - available (15 kW),
water supply - individual well (30 m),
sewage - autonomous (individual bio-treatment station Eurobion),
security - . Infrastructure: Within walking distance of the Filatov Lug metro station, as well as the Filatov Lug residential complex with all the necessary infrastructure (schools and kindergartens, shops, pharmacies, fitness center)