The object code in the agency database: 535-835, Kaluga highway, 7 km from MKAD, synergy of the Communist Party (Zimenki). Beautiful functional project of the house, high -quality construction. Large windows. High ceilings. There are 5 bedrooms in the house. A plot with its own exit to the forest. The village is built up and has all centralized communications. The proximity to the Moscow Ring Road (7 km, almost the same from the 2nd highway), to the metro 5 minutes on the car. Building type: formed to/p. Pl. Houses 220KV.M., pl. site 5 hundred. Stage of readiness: for finishing. Bedrooms: 5. With diluted communications. S/Nodes: 4. Rooms in total: 7. Important options: terrace (covered). Windows: PVC double-glazed windows (2-chamber white with ReachMont, large N-2.5 m size, on the attic-attic Velux). Year of construction at home: 2024.Roof: soft (PVC drainage drain).
1st floor: the hallway of 16 sq.m with a dressing room 3.2 sq.m, a 28 sq.m kitchen with an exit to a terrace of 25 sq.m, a bedroom 16 sq.m, a bathroom 4.6 sq.m (shower), a boiler room 3.3 sq.m with a separate entrance.
2nd floor: hall 6 sq.m, main bedroom 15 sq.m with a bathroom of 6.3 sq.m (bathroom) and with a wardrobe of 6.3 sq.m, bedroom 15.4 sq.m, a bedroom 13 sq.m, a total bathroom of 5.4 sq.m (shower, bathroom).
3rd floor: Hall 7 sq.m, Bibliotek cabinet 20 sq.m, bedroom with a dressing room 17 sq.m, 3 sq.m bathroom (shower). Interior decoration: for finishing with diluted communications. The black screed is flooded and warm floors (water) are arranged. The railway staircase is monolithic with a width of 0.95 m. Engineering support: heating and warm floors are divorced, the e/e is divorced to points. A gas boiler and an indirect heating boiler will be installed. Ventilation is natural supply and exhaust .. Type of the site: Prigelnaya (with its access to the forest).Landscaping of the site: the lawn is planted, paths around the house were made, drainage, and a parking for 2 cars was organized. \ nstatus of the Earth: lands of settlements for IZHS. Communications:
GAZ - there is (trunk),
e/e - is (10 kW),
water supply - central (VZU to the village),
Sewerage - centralized (sewage treatment plants),
Protection - there is (checkpoint). Infrastructure: Infrastructure in the village: an entrance group with parking, a total access to the forest, a private kindergarten. External infrastructure: the best school in Russia in Letovo, a sports center tennis with courts, a pool and a fitness club. In 1 km metro Filatov meadow. At 500 m, a public transport stop to M Teply Stan (bus 878). Mega, Auchan, IKEA, shops and restaurants in Dubrovka, sports complexes and other services in the village of Gazodin, Voskresenskoye and Moscow.