New quarter of private houses with separate regulated plots in the town of Pomorie
Property description
New modern project, consisting of 13 private houses, located in the so-called "new part" of the town of Pomorie. The area is calm and quiet. The southern city beach is 350 meters away.
The project started with the construction of 4 private two-storey houses, the total built-up area of which varies from 210.92 sq.m to 235.12 sq.m. The houses are designed for year-round living. Luxurious and extremely functional houses will be built from high-quality and modern materials. The area of the land on which the buildings will be built is 109 - 200 sq.m. Each plot has its own landscaped yard.
House layout
Each house consists of:
- ground floor: garage with a separate entrance and access to the hallway, hallway, living room, kitchen, combined bathroom, storage room suitable for central heating, internal stairs leading to the second floor;
- second floor: 2 bedrooms, combined bathroom, and VIP bedroom with its own combined bathroom and balcony, spacious terrace.
Construction characteristics
The building structure is made of reinforced concrete, external and internal partitions are brickwork.
Each house will be insulated with hydro- and thermal insulation. Facade treatment provides for 50% travertine stone cladding and a combination of structural polymer hydrophobic plaster, railings on the balconies are wrought iron.
Window frames are five-chamber PVC“DECEUNINCK”, color: white.
The roof is sloping, covered with tiles.
Landscape design of each plot and the entire territory is provided, where stamped concrete will be laid for convenience and an openwork fence made of wrought iron and a hedge will be installed.
Garages will be equipped with metal roller shutters. All materials used have a European quality certificate.
Finishing of houses
Each house will be commissioned with final finishing:
Garages:
When purchasing a house, at the client's request, it will be possible to make partial internal changes to the layout. Also, for an additional fee, we offer turnkey completion of the house and furnishings.
Construction time
Construction of the first 4 houses began in September 2018.
Completion date - 2 years.
By September 2022, one house remains for sale, Act 15 is expected in October, the house is in rough finishing, the facade is finished.