The object code in the agency database: 390-902, Kaluga highway, 29 km from MKAD, Deshino (Shishkin Forest). A new high -quality turnkey house in a hot cottage development. Functional layout, 5 bedrooms, a living room with a wood fireplace. A landscaped area with landings and lawn. At 400 m there is a large pond with the embankment. Building type: cottage development. Pl. houses 141kv.m., pl. site 4.5 hundred. Stage of readiness: turnkey. Bedrooms: 5. S/nodes: 2. Rooms in total: 6. Important options: fireplace; Cold basement. Windows: PVC double -glazed windows (Rehau, laminated under a tree outside). Year of construction at home: 2021. Roof: soft (plastic drainage system).
1st floor: porch 4.5 sq.m, hall with a staircase of 11.1 sq.m + 2 sq.m, bathroom 6 sq.m with shower, 5.5 sq.m, kitchen-dining room-living room 26.5 sq.m, bedroom 12 sq.m with a pantry of 2 sq.m ..
2nd floor: hall with a staircase of 10.4 sq.m + 2 sq.m, bedroom 14.8 sq.m, bedroom 13 sq.m, bedroom 13 sq.m, bedroom of 12.8 sq.m, bathroom 5.0 sq.m with the bathroom ..Interior decoration: on the walls, decorative plaster with painting, in the bathrooms - tiles. On the floor of the 1st floor - porcelain tile, the 2nd floor is a laminate. A staircase of standard width with backlight, steps - oak painted. The ceilings of the 1st floor are plastered, the 2nd floor is stretch. All plumbing is installed. On the ground floor, a warm floor is everywhere. Legran sockets and switches. Yunio interior doors. The house has a wood fireplace (finished with natural stone) .. Engineering support: installed gas boiler VISSMANN 24 kW wall, reserve electric boiler, an indirect heating boiler from a gas boiler, a mechanical water filter. Air conditioning in the living room. Intercom. Electric stabilizers for 3 phases. Hoods in all rooms .. furniture, equipment: cornices on all windows of the 1st floor, on the 2nd floor curtains on cornices. There are chandeliers everywhere (except for the kitchen). Stairs back .. Type of site: with landscape and young trees. The landscaping of the site: the site is landscaped, the platform for the car is laid out a paving stones. Trees (apple trees, cherries), shrubs (repairman), thuja, lawn grass were planted ..Communications:
There is a gas (GAZGolder 5 cubic meters),
e/e - is (15 kW),
water supply is an individual. well (43 m),
sewage - autonomous (Topas bio -cleaning station, 6 people),
Security -.