Land for construction of 5 MW solar power plant with all permits for sale. Turnkey construction is possible. BESS option avaliable.
For exact specifications please contact us. The photo is symbolic. Lic: https:// rudalle. ru. Copying, reproduction, distribution, reprinting (in whole or in part), or other use of the material without the written permission of the author is not allowed. Any violation of the author's rights will be prosecuted on the basis of international law.