The new pearl of the Alanya coast – a large-scale premium residential complex just 100 meters from sandy beaches and the azure sea in an ecologically clean area of Alanya – Kargicak.
Spacious territory, wonderful views of mountain landscapes, infrastructure of a five-star hotel, discreet luxury and unity with nature, comfort and safety.
The complex consists of five 5-story blocks with a total area of 10,000 m2. Excellent investment prospects
at the start of the project. Wonderful opportunities for high rental income.
Location:
- to Gazipasa airport - 25 km
- to the center of Alanya - 15 km
- to the center of Mahmutlar – 2.5 km
- to the sea – 100 m
- to the store – 100 m
Types of apartments, number and area:
- 1+1 apartments – 83 pcs. (58/63/67/71/76 m2)
- 2+1 apartments - 16 pcs. (86/91/93/96 m2)
- 2+1 two-level - 29 pcs. (from 111 m2 to 127 m2)
- 3+1 two-level - 4 pcs. (165 m2)
- 2+1 two-level with garden - 7 pcs. (117/119/121 m2)
Complex infrastructure:
- outdoor pool
- children's pool
- outdoor pool with water slides
- sunbathing area
- cafe-bar by the pool
- shower by the pool
- indoor pool
- sauna
- Turkish bath (hamam)
- massage room
- relaxation area
- locker rooms, showers, bathrooms
- gym
- children's playroom
- lobby
- 2 elevators in each block
- fire escape
- children's playground
- walking paths
- tennis court
- basketball court
- landscaped garden
- outdoor parking
- indoor parking
- 24/7 security
- caretaker
- video surveillance system
- satellite system
- power generator
- control company
- commercial premises
- private beach
- cafe on the beach
Apartment characteristics:
- steel entrance door
- double aluminum glazing on the windows
- balcony
- interior doors
- built-in kitchen unit with granite work surface, equipped bathroom (shower cabin, plumbing set, faucets, built-in furniture, wall mirror)
- main and decorative system
- lighting
- floor covering – ceramic tiles
- on the walls – washable paint
- sockets and switches
- TV cable
- air conditioning wiring
- ceiling height – 2.95m
Payment plan:
- down payment – 35% of the cost
- remaining cost - interest-free installments are provided until the completion of construction in accordance with the payment schedule
Start of construction – June 2023
Completion of construction – August 2025
Information updated: 01/16/2025