Newly built residential complex in Burgas, Izgrev district
Location
The complex is being built in a new extension of the Izgrev district of the city of Burgas. In close proximity to Metro, Mall Plaza, hypermarkets Kaufland and Lidl. Fast and convenient access to the main road arteries, a completely new infrastructure, a high level of comfort for residents, green spaces.
Description of the complex
The complex is a 9-storey building, consists of shops, functional apartments with 1st and 2 bedrooms, ground and underground parking spaces.
The complex combines modern functionality with the corporate architectural style of the developer, who has already implemented more than one project here.
Spacious green spaces and cozy and bright apartments, and most importantly - a sense of home and tranquility in the heart of the city.
The apartments are rented on a rough finish.
Garages, ground and underground parking spaces are offered for sale.
Construction characteristics
General parts:
Staircase and common parts: granite tiles;
- Walls and ceilings: plaster putty and latex paint;
- The railing by design;
-Oron's hydraulic elevators;
Facilities (bedrooms, kitchens, dining rooms, living rooms and corridors):
- Walls and ceilings: plaster with aluminum angular profiles;
-Floors: cement screed;
- Wet rooms: lime and cement plaster; floor: cement screed;
Balconies:
- Walls and ceilings with facade plaster, with installed lamps;
-Floor: porcelain tiles;
- Project railings;
Windows:
Glass packages with 5-chamber energy-saving glazing "4 seasons";
Doors:
- Anti-breaking entrance doors in the apartments
Installation of sanitary equipment:
- Polypropylene /reinforced and insulated / on the "congestion";
Electrical installation:
- A high-current electrical installation for lighting and sockets was built;
Electricity meters have been installed;
- An electric flat.
-Switches and sockets installed;
Lamps are installed on balconies;
- Installation of the bell and intercom;
Internal installations for telephone, Internet and television;
Parking spaces:
- Walls and ceilings: executed according to the project;
-Floor: polished concrete;
Facades:
-Exterior walls: Wienerberger brick;
Insulation of brick walls with foam 10 cm - Baumit;
-Facade mesh, glued with glue - Baumit;
Structural polymer plaster - Baumit;
Heat insulation on concrete surfaces - XPS 10 cm;
Duration of construction
Start of construction: December 2024.
Construction time: 24 months.
No support fees in the complex
Payment scheme
The option of deferred payment during construction.
Commission from the buyer: 3%