Object code in the DB Agency: 448-743, Kiev Highway, 21 km from MKAD, Capitol to/p (Pervomaysky).
The new house on the key of a successful plan of 185 sq.m on a plot of 4.25 ares in the inhabited village of Kapitoliy. The house has a large kitchen-living room, 4 bedrooms, one of which is on the 1st floor, 3 bathrooms. All central communications are built into the house (electricity, water supply and sewerage). Plumbing is installed. Warm floors everywhere. Near the village there are forest, river and infrastructure of the village of Pervomaysky (school, kindergarten, shops, pharmacies, banks, etc.). The house is built. Work is underway on interior decoration. Moscow propiska.
Type of building: formed by/p. Pl. house 185sq.m., pl. plot 4.25 hundred. Ready stage: turnkey. Bedrooms: 4. House built. Work is underway on interior decoration.. C/nodes: 2. Rooms total: 6.
Important options: terrace (optional); bedroom on 1 floor, study.
Wall cladding: plaster (facade insulation 100mm, tiles and facade plaster with painting). Windows: PVC double-glazed windows (2-chamber, laminated on both sides.). Year of construction of the house: 2023. Roof: soft.
1-th floor: Veranda 4.3 sq.m, entrance hall 8.6 sq.m, office 7.5 sq.m, kitchen-living room 43.4 sq.m with access to the yard, bedroom 16 sq.m, bathroom with shower cabin 4.8 sq.m, boiler room 4.4 sq.m.
2nd floor: hall 8 sq.m with access to the balcony, bedroom 23 sq.m, bedroom 20 sq.m, bedroom 16 sq.m, bathroom with bathroom 8.6 sq.m.
Interior finish: Designer modern repair. The walls are plastered and painted. On the floor and in the bathrooms - expensive porcelain stoneware. Expensive front door with glass and forging. Tension ceilings with built-in lamps. Staircase monolith, finishing steps porcelain stoneware, railings art forging. Quality plumbing is installed. Warm floors on all floors. ProfilDoors interior doors, painted with white paint, high baseboards of the same color. PVC windowsills, laminated under the color of windows..
Engineering: Installed Electric single-circuit boiler Stout – storage electric water heater Electrolux EWH 100 Royal. All communications are put into the house. On the 1st and attic floors warm water floors..
Plot type: without trees.
Improvement of the site: The plot is leveled,. \nThe status of the land: the land of settlements, for suburban construction.
Communication:
gas - is (Autonomous gasification is possible),
e/e - is (380W, 14kW),
water supply - central,
sewerage - centralized,
security - there is (Passage mode, the entry of owners by magnetic keys. Engineering objects - under video surveillance).
Infrastructure: Near the KP Capitol - about 300 meters - the village of Pervomaysky, where all infrastructure is located: school, kindergarten, polyclinic; on the territory of the village children's and sports grounds, recreational alley, etc, it will also organize its own exit to the forest and to the river with walking paths. Recreation area Park Hotel «Imperial». It is convenient to get to the cottage village both by car and by public transport from M. Southwest, m. Warm camp or Salaryevo (bus and route №304) - bus stop is 300 meters from the KP Capitol.