The object code in the Agency database: 448-748, Kyiv highway, 21 km from the Moscow Ring Road, Capitol k / p (Pervomayskoe).
It's possible to get a preferential mortgage! A quality house under a clean finish at an attractive price! With a White Box finish of 135 sq.m. in a guarded cottage village Capitol. 3 bedrooms, kitchen-living room, 2 bathrooms. The house is everywhere warm floors, panoramic windows to the floor. Conveniently combined kitchen-dining-living room with access to the terrace. Central communications. In walking distance school, kindergarten, public transport stop. Moscow residence permit. The house is built. Internal work is under way. Turnkey finishing possible!
Type of building: formed k / p. Place. house 135 sq.m., area 4 hundred. Preparation stage: under the clean finish. Bedroom: 3. The house is built. Internal work is under way. C/nodes: 2. Rooms total: 4.
Important options: terrace; Large panoramic windows.
Windows: PVC glass units (2-chamber, laminated on both sides). The living room has floor glazing. Year of construction: 2024. Roof: cement-sand shingles (Braas, insulation of min.wool 200 mm).
1st floor: hallway 4 sq.m., technical room 5 sq.m., guest bathroom 2 sq.m., kitchen 8 sq.m., living room 31 sq.m. .
2nd floor: corridor 3 sq.m., bathroom 7 sq.m. with bath and shower, bedroom 15 sq.m., bedroom 12 sq.m., bedroom 12 sq.m. .
Interior decoration: The walls are plastered, a rough layer of putty. On the floor screed, arranged warm floors in all rooms. Stairs are monolithic. .
Engineering: the house has an electric boiler Protherm Skat RAY 9 KE /14, 9 kW, single-circuit, new generation. Natural ventilation. The boiler room has an additional wet point for connecting the washing machine. All communications are in the house. On the 1st and attic floors warm water floors. Engineering was done, wiring of water and sewerage, electricity to the points. .
Site type: Field.
Improvement of the plot: the plot is leveled, the parking lot for cars, the pavement and the path to the house are paved with pavers. Land status: land of settlements for suburban construction.
Communications:
gas is (connection of main gas 2027g),
e/e is (380W, 14kW)
water main - central,
Sewerage - centralized,
Security - there is (COP, checkpoint).
Infrastructure: Near the KP Capitol - about 300 m - the village of Pervomayskoe, where all the infrastructure is located: a school, a kindergarten, a polyclinic; on the territory of the village there is a children's and sports grounds, a walking alley, and there will be organized its own exit to the forest and to the river with pedestrian paths.
Five star hotel and SPA-complex "Tepleevo Resort", which includes: kindergarten "Empire of Knowledge", visiting tourist club, sports and creative clubs, preparatory classes for school, etc., business center with conference rooms, restaurants, fitness center, SPA-club, 25-meter swimming pool with geyser and massage countercurrents, children's pool with a slide, Finnish saunas and Turkish hammam, aroma-bath, cosmetology, solarium, image, bank, prachemistry. And also fishing, horse riding, ATVs, paintball, shooting range, tennis courts, basketball, martial arts halls, parking. In the village of Rogozinino, there is a Shopping Center, the Perekrestok store, the Russian Tennis Academy (except for tennis: martial arts, children's club, fitness studio), the restaurant "Spring", the SPA complex and the Vnukovo International School.
To get to the cottage village is convenient both by car and by public transport from Southwest, M. Teply Stan or M. Salaryevo (bus and minibus No. 304) - the bus stop is 300 meters from the KP Capitol.