Object code in the Agency database: 345-932, Kaluzhskoe highway, 35 km from the Moscow Ring Road, Nikolskie Ozera checkpoint (Filino). A new house of beautiful architecture in a lived-in, guarded cottage community with central communications and a large lake with an equipped beach. The cottage was built using high-quality expensive materials: porous ceramic blocks, façade cladding with very beautiful hand-molded Belgian bricks, Italian ceramic tiles. Large parking for cars. There is a concrete cellar. Type of development: habitable apartment. Pl. house 290 sq.m., pl. plot of 15 acres. Stage of readiness: for finishing. Bedrooms: 4. turnkey boiler room, all communications are installed and working (electricity, water supply, sewerage, heating, heated floors). Bathrooms: 3. Total rooms: 6. Important options: terrace; cellar 10 sq.m (2.75x3.7 m). Windows: PVC double-glazed windows (RENAU Delight-Design, double-chamber).Roofing: natural tiles (ceramic (Italy) Cottosenese Francigena Millenium; plastic drain Nicoll Ovation 28 France).
1st floor: porch 5.5 sq.m, vestibule 4 sq.m, hallway 13.3 sq.m, dressing room 11 sq.m, living room 39.5 sq.m, kitchen-dining room 31.7 sq.m , terrace 15.9 sq.m., bedroom 18.2 sq.m., bathroom 8.85 sq.m., boiler room 6 sq.m., porch 1.8 sq.m..
2nd floor: hall 35 sq.m., master bedroom 23.6 sq.m. with bathroom 7.2 sq.m. and balcony 9.3 sq.m., bedroom 19.8 sq.m., bedroom 24.3 sq.m. .m., balcony 7 sq.m., bathroom 8.8 sq.m..
3rd floor: storage area with retractable staircase.. Interior finishing: to be finished; turnkey boiler room (walls and floor - porcelain stoneware). There is a screed on the floor in the house. Monolithic staircase of standard width. GROHE installations were installed under the toilets. All communications in the house are installed, connected and working (electricity, water supply, sewerage, heating, heated floors).. Engineering support: a 60 kW Buderus gas boiler, a 250 l Drazice boiler are installed.. Type of plot: no trees.Landscaping of the site: a lawn has been planted on the site, 2 pears, Chinese cherries, currants, raspberries, and walnuts are growing. \nLand status: lands of settlements provided for summer cottage construction. Drainage has been organized throughout the site and around the house. Parking space for 5-6 cars, paved with paving stones.. Extras. buildings: utility block 4.5x5.9 m with a cellar 10 sq.m. (3.7x2.75 m).. Communications:
gas - yes (main),
electricity - yes (15 kW),
water supply - central,
sewerage - centralized,
security - yes (private security company). Infrastructure: At the entrance to the village there is a well-maintained sand beach by the lake and a walking area along the embankment. A green trail in the forest was organized around the village (bicycle, walk, skiing in winter). On the territory of the village there is an administrative building, where the administration and operation service of the village, the Family House children's leisure center with a mini-kindergarten for children from 3 to 7 years are located.The center also hosts classes in yoga, Pilates, mental arithmetic, creative master classes for both children and adults: painting, pottery workshop, wool felting, floristry, polymer clay modeling. Children's and sports grounds and a football field have been organized. There are two walking boulevards with benches. The village is fully built and provided with all central communications. Inside the village there are wide and illuminated roads. At the entrance to the village there is a checkpoint with security and a barrier. An asphalt road leads to the village. Developed urban infrastructure is located in the villages of Voronovo and Shishkin Les.
Posted at: 20/04/2024
Updated at: 02/05/2024