Hydroelectric power station
Capacity 400 kW
Address: Grodno region, Ostrovetsky district, Mikhalishkovsky village, Olkhovka village, st. Sovetskaya, 8B
Located in a picturesque location on the Stracha River.
Object composition:
- land plot 0.0623 hectares
- block assignment of a hydroelectric power station
- turbine site.
The hydroelectric power station building and land are owned. The facility was put into operation in April 2023 (complete reconstruction was carried out).
It consists of two turbines with a capacity of 200 kW each, produced by the Polish manufacturer WTW POLAND SP.Z O.O. The service life of turbines is more than 50 years.
Estimated design production is 2200-2400 thousand kW per year. Actual production, based on the first year, will be 1600-1800 thousand kW, subject to an unusually dry warm season.
At the cost of one kW/hour for production enterprises of 0.36 rubles/kW (including VAT), production will be today: estimated - 792-864 thousand rubles per year, actual for the first year - 576-648 thousand rubles per year.
With the cost of one kW/hour for non-production enterprises 0.492 rubles/kW (with VAT ) estimated production will be 1082-1180 thousand rubles per year, actual production for the first year will be 787.2-885.6 thousand rubles.
Ready investment project with excellent payback.
Payback period of the investment project is up to 8 years or 12.5% per annum. Which is suitable for lending programs for investment projects with a rate of about 4% per annum.
HPP is also ideal for mining farms.
The buyer does not pay for the services of a real estate organization!
Your agent – Andrey Smolka
,
Short number (MTS, A1, Life): 7-800
More offers on the SITE Silvan7800.by
< p>Join us on social networks:VK
OK
YouTube