Welcome to the residential complex under construction, located in the Tomyuk picturesque area in Mersin.
This unique complex provides a variety of properties for sale, taking into account various options, including apartments and villas.
Plans on sale:
- 1+1: area 70-75 sq.m.
- 1+1 duplex: area 100 sq.m.
- 2+1: area 100-105 sq.m.
- 3+1: area 160 sq.m.
- Villas 4+1 : area 225 sq.m.
Only 1 villa left. Villa suitable for citizenship !
Number of floors in the complex: 15
Heating system: each apartment has an air conditioning system (KLİMA TESİSATI).
Distance to the sea: Only 150 meters.
Additional features:
Stage 1 consists of blocks A and B and four villas, with a total of 357 apartments. The complex includes a basement, ground floor and 15 floors.
Location:
- Erdemli city center is only 7 kilometers away.
- The clinic (Outpatient clinic) is only 250 meters away.
- Pharmacy - 250 meters away.
- Migros supermarket - within 400 meters.
- Primary school 1.2 km away.
- Bakery, restaurant and gas station - everything within a radius of 300 meters.
Apartment characteristics:
- The floors in the hallway, bathrooms and balconies are made of ceramics.
- The bedrooms have 8 mm laminate.
- The apartments have wardrobes in the hallway and kitchen sets made of MDF.
- Bathrooms are equipped with showers, sinks, ceramic floor and wall coverings, as well as lighting fixtures.
- Each room has air conditioning leads and ceilings made of plasterboard.
- The entrance doors in the apartment are steel.
- The fences on the balconies are made of tempered glass.
- Panoramic windows with aluminum profiles.
- Apartments 2+1 have a dressing room or wardrobe in the bedroom.
The infrastructure complex includes:
- Fitness room.
- Basketball court.
- Tennis court.
- Outdoor pool.
- Cafeteria in the pool.
- Indoor pool.
- Hamam.
- Children's pool.
- Sauna.
- Steam room.
- Cinema hall.
- Water park.
- BBQ areas.
- Children's playground.
- Open parking.
- Walking paths.
- Generator.
- CCTV system.
- Gazebos for relaxation.
- Parking for bicycles.
- 24-hour security.
For your convenience, use the option of purchasing a property with a community down payment of 50% and a payment of 3 months.
Construction completion date: 12/30/2024
Information updated: 16/05/2024.