Object code in the Agency's database: 709-702, Kaluga highway, 14 km from MKAD, etc. Dumb .
House for finishing with a separate spa complex in the inhabited cottage village of Polyana. During the construction of the complex of buildings, high-quality materials were used: the ceilings were made of cedar, on the floor of wood of the 1st class. The spa complex has a swimming pool, a knight's room, a banquet room, a relaxation area and a large garage for 4 cars. The boiler room is taken outside the boundaries of the residential building. The site borders the forest and has its own access to the Desna River. Excellent transport accessibility.
Built-up type: inhabited by / p. Pl. houses 659sq.m.pl. plot 12 hundred. Stage of readiness: for the finish. Bedrooms: 2. Wall material: aerated concrete. S / nodes: 4. Rooms total: 9.
Important options: pool (32 sq.m); apartment for staff; terrace (3 pcs.); fireplace (4 pcs.); cold basement; indoor car seats: 4; at the entrance by the river, a platform for a winter gazebo of 12 square meters was concreted.m.
Windows: PVC double-glazed windows (3-chamber). Blood: soft.
Ground floor: vestibule 3 square meters.m, room No. 1 27 sq.m, room No. 2 27 sq.m, room No. 3 9 sq.m, room No. 4 8 sq.m..
1st floor: HOUSE: porch 8 sq.m, living room 23 sq.m, kitchen-dining room 31 sq.m with fireplace and access to the street, bathroom 6 sq.m, guest bathroom 4 sq.m;
SPA complex: garage 76 sq.m, room No. 1 5 sq.m, room No. 2 6 sq.m, room No. 3 6 sq.m, corridor 26 square meters.m, boiler room 12 square meters.m, the knightly hall 73 square meters.m..
2nd floor: HOUSE: a free-use room with access to the balcony of 54 square meters.m, balcony 8 sq.m, bathroom 9 sq.m;
SPA complex: knightly hall No. 2 58 sq. M.m, bathroom 5 sq.m, balcony 9 sq.m, recreation area 58 square meters.m, pool 32 sq.m, banquet room 76 square meters.m..
Interior decoration: for the finish: the floor of the 1st floor of the residential building is partially covered with tiles, on the entire ground floor there is a warm floor; the floor of the 2nd floor of the residential building is covered with wood of the 1st class. Staircase in the SPA screw complex, steps 25 * 19 cm. The ceilings of the residential building are made of cedar boards, the joints are closed with a decorative tap dance, the beams are hand-cracked bars of cedar with a diameter of 80 cm. The ceilings are covered with special impregnation. E / e is divorced around the house and SPA complex, turnkey heating (warm floor + premium batteries)..
Engineering support: the house has a Unical MD 93 93 kW gas boiler (powered by gas and diesel fuel) and a 300 liter boiler. Natural ventilation..
Type of plot: with trees.
Communications :
gas - no (connection is possible),
e / e - there is (15 kW),
plumbing -,
sewerage - ,
security - there is (at the entrance of the checkpoint (the gates open on the call)).
Infrastructure: At 1 km infrastructure mkr. New Vatutinki: 3 children.gardens, 2 schools, clinics, on-duty pharmacies, a bank, food stores, pet stores; 3 km of. Trinity with all urban infrastructure; nearby Vatutinka UDP sanatorium with pool, bathhouse, gym, etc.; CSKA sports base with pool and sections.