This modern apartment project will be located within one of the most distinctive complexes in the Caribbean “VISTACANA”, with 1, 2 and 3 bedroom apartments, where you can enjoy spaces designed especially for you overlooking the Grand Central Park.
Integrating an exclusive Hotel Lobby and 4 level buildings with state of the art elevators, keeping us at the forefront of the market adding value in its architecture along with a vibrant and distinguished Caribbean atmosphere.
Located 10 minutes from Punta Cana International Airport in the Dominican Republic, 5 minutes from the most beautiful beaches of turquoise waters of the Caribbean and 15 minutes from the first and only theme park in the Caribbean “Katmandu Park”.
We are inspired by a lifestyle that promotes good living under the harmony of nature, seeking that residents manage to enjoy a pleasant environment, attached to the principle of respect and fraternity.
Amenities:
– Park Sauna & Spa
– Pets Friendly
– Green spot for electric vehicle charging
– Grand Central Park
– The Woods Restaurant
– Garden Cigar with furnished and air-conditioned Billiards
– Pool Lounge and Solaris Desk
– Run & Play Kids Park
– Coworking Space
– Gymnasium
Finishings:
– Smooth finish on walls (certain restrictions apply)
– General porcelain tile floors
– Imported ceramic tile in bathrooms
-Plaster finish on ceilings and cornices
– Precious wood engineered doors and closets
– Modular kitchen cabinets, with top and blacksplash in natural granite.
Project features:
Gated project with 24/7 security.
– 4-story building with state-of-the-art elevators and full power plant.
– Electric gate and audio intercom with digitized access control.
– 2 water pumps (one for continuous use and one for emergency).
– Appliances and air conditioners included in all apartments.
– 9 apartment models to choose from
Prices
from US$93,500. Up to US$205,000.
Floor space from 52m2 up to 128m2.
Payment method:
Deposit with 10% of the unit, for reservation and contract.
40% → To be completed in September 2024
Down payment (during the construction)
50% → Final Payment in November 2024
Upon delivery of your unit
Start of construction → August 2023
Delivery date: November 2024
Amenidades