Object code in the Agency's database: 137-420, Kaluga highway, 11 km from MKAD, Desna. New house of ultra-modern architecture with an area of 350 sq.m. High-quality construction - walls made of warm ceramics of maximum thickness (51 cm), thermo-ash timber and aluminum composite panels were used in the facade decoration. Prepared for final finishing. Functional layout: 4 master bedrooms, one of which is on the ground floor, a single space of the living room-dining room-kitchen with a fireplace and an exit to the yard, a separate laundry room. High ceilings, expensive and high-quality panoramic glazing made of warm aluminum. Quiet, inhabited place. Proximity to old Moscow and excellent transport accessibility (no traffic lights from MKAD). No settlement payments. Type of development: cottage development. House area 350 sq.m., plot area 11.2 acres. Stage of completion: ready for finishing. Bedrooms: 4. Bathrooms: 3. Total number of rooms: 6. Important options: terrace. Windows: aluminum double-glazed windows (2-chamber, panoramic, graphite color).Year of construction: 2024.
1st floor: hall 11.8 sq.m, staircase hall 13.9 sq.m, kitchen 16.3 sq.m, dressing room 6.3 sq.m, bedroom 21.5 sq.m, bathroom 8.4 sq.m, laundry-ironing room 8.9 sq.m, boiler room 5.9 sq.m.
2nd floor: corridor 15.9 sq.m, staircase hall 11.5 sq.m, bedroom 2 19.1 sq.m, dressing room 3.8 sq.m, bathroom 5.4 sq.m, bedroom 3 27.8 sq.m, dressing room 6.2 sq.m, bathroom 12.1 sq.m, bedroom 4 16.1 sq.m, dressing room 9 sq.m, bathroom 8.8 sq.m. Interior finishing: walls are plastered and puttied, electrics are laid out to the points (sockets, switches and lighting - under chandeliers), plumbing is laid out to the points. The floor is covered with screed, heated floors - everywhere on the 1st floor, on the 2nd floor - in the bathrooms. Monolithic staircase 117 cm wide. Wiring for a split system (air conditioners) is done throughout the house. Kermi steel panel radiators - everywhere where the windows are not from the floor. Garage gates - lifting on the remote control (width approx. 4.5 m).Engineering support: the house has a Haier gas boiler + a backup electric
190 l Termica boiler, 2 coarse water filters. Natural ventilation, forced ventilation in the bathrooms. Everything is wired for a multi-split system (1 external block, 5 internal blocks). Plot type: without trees. Land improvement: the plot is leveled, a rolled sports lawn is laid, a parking area, paths and a blind area are made - a poured polymer floor on a reinforced concrete base 12 cm thick. \nLand status: individual housing construction. Drainage is organized. Sliding gates with an automatic drive (width approx. 6 m). Communications:
gas - yes (main),
electricity - yes (15 kW),
water supply - individual. well (67 m),
sewerage - autonomous (bio-treatment station Topas),
security - . Infrastructure: grocery store 100m away, Church of Archangel Michael, helipad, settlement administration. Novye Vatutinki Central district 15 min walk away (schools, kindergartens, shops, supermarkets, leisure facilities, clinic, etc.)
Posted at: 21/09/2024
Updated at: 14/11/2024