New investment in Służewiec – Rynek Pierwotny
The entire estate consists of three modern buildings. On the ground floor there are apartments with gardens. The remaining apartments are equipped with spacious balconies. We have also designed a two-story underground garage with a license plate reading system. All buildings are equipped with elevators, an access control system via a mobile application, monitoring and security.
• On the estate premises there is a representative square with a relaxation zone,
• Playground for children and an outdoor gym,
• A mural that will decorate one of the walls of the building,
• It will be a unique artistic project, giving character to the immediate surroundings,
• An undoubted advantage of the investment is the retention of rainwater, which will be used to irrigate the green parts of the estate.
STANDARD
Developer's condition.
• Studio apartments/from studios to 4-room apartments,
• Underground garage with a license plate reading system,
• Parking spaces with the possibility of installing a charging station for electric vehicles,
• Equipped with many modern solutions, including anti-burglary doors with increased security class, optical fiber and RTV connector,
• Photovoltaic panels on the roof,
• Rainwater retention,
• Energy-saving LED lighting will appear in the common parts of the buildings,
• There will be plenty of greenery on the estate.
LOCATION
• Easy access to the Southern Bypass of the city, numerous bus stops, as well as the train station,
• Getting to the city center takes only a dozen or so minutes,
• Excellent location for lovers of two wheels: an extensive network of paths allows for trouble-free movement around the city by bike,
• In a few minutes you can reach Galeria Mokotów, the Business Center in Służewiec, the Park on the Służewiec Pond or the indoor swimming pool,
• An undoubted advantage of the location is the proximity of green areas. There is the Park on the Służewiec Pond, Pawlukiewicz Park or the Dolinka Służewiecka Park, and a little further away Pole Mokotowskie.
ADDITIONAL INFORMATION
Planned completion date April 2026,
A storage room and a parking space in the garage can be purchased for an additional price.
Monitoring on the investment site,
The buyer does not pay a commission.
Ask about it, similar or larger apartments.
Posted at: 13/09/2024
Updated at: 13/09/2024