New residential building under construction in Varna, in the prestigious area of St. Constantine and Elena
Location
The building is located in the heart of one of the most famous resorts of Varna - St. Constantine and Elena, within walking distance from the beach and the most famous attractions that attract tourists from the country and abroad. The location of the building is attractive due to its proximity to the center of Varna - only 8 km.
Property description
The entrance to the building is designed from the north side, in front of it there will be 16 open parking spaces. In total, there will be 45 parking spaces on the territory of the facility, of which 29 are in the underground garage. The building will have an elevator for 10 people and a total of 22 apartments. Bicycle parking and spaces for the disabled are also provided.
Construction characteristics
The structure is reinforced concrete, beam and monolithic, with vertically located supporting elements. Walls - double-layer brick with a layer of external thermal insulation. Partitions - single dense brick.
High-quality facade plaster, HPL boards and stone cladding of the basements and some elements of the building. All balconies and terraces are protected by glass and metal railings 105 cm high. It is planned that the air conditioners will be installed in a special inspection niche behind the metal frames and hidden.
High-quality anthracite-colored PVC window frames will be installed, which will match the overall architecture.
The roof is flat, hydro-, steam- and heat-insulated, with several layers of high-quality roofing.
It is planned to lay the general thermal insulation of the facade of the XPS type with strips of fire-resistant stone wool.
The building design includes the construction of all necessary utility networks - power distribution, water supply and heating, ventilation and air conditioning. To increase the thermal efficiency of the building, it is planned to lay an additional layer of heat and sound insulation. All fire safety measures were taken during installation of electrical installations.
Payment scheme
30% upon signing of the preliminary agreement
30% upon receipt of Act 16
30% upon receipt of Act 15
10% upon commissioning of the building
Construction time
Construction in progress
March 2024 - the building has reached the 4th floor
Buyer's commission: 3%