New project - a residential building with apartments and garages in Pomorie, 700 m from the sea, close to the city center and SPA complexes
Advantages
- Excellent location 700 m from the sea;
- Close to rehabilitation and SPA centers;
- Not far from the city center;
- High-quality construction, variety of layouts
Location
Pomorie is a picturesque Black Sea town with a population of about 13,500 people, located 20 km north of Burgas. It is a popular seaside and balneological resort, a preferred place for family holidays.
The beach strip of Pomorie stretches for 7 km in length. The shallow and gently sloping seabed without reefs and cold currents allows for safe swimming and is ideal for small children.
In addition, Pomorie is the largest mud-therapy resort in Bulgaria. The salty Pomorie Lake is rich in valuable meadows, which are used to treat a number of diseases in modern balneological centers.
Construction characteristics
- The facade is a monolithic steel-concrete structure, brickwork of the external and internal walls.
- Thermal and waterproofing;
- Facing with natural stone "travertine" on the basement floor and a combination of Austrian ventilated cladding "versalit" and mineral silicone plaster on the remaining floors.
- Common parts of the building - full finishing, walls - stone "Travertine" on the basement floor, other floors - water-repellent and UV-resistant plaster "Tracon"; floor - porcelain stoneware, stairs - natural granite (solid steps);
-Roof - waterproofing;
-Terraces - waterproofing, porcelain stoneware, railings - aluminum
-Windows - 5-chamber PVC windows, color "golden oak";
-Water supply and sewerage - according to the project, with installed water meters
-Electrical installation - according to the project, internal electrical installation to switches and sockets with installed lighting fixtures
-Installation of an intercom, cable for telephone and Internet, internal cable network to the exit
- Entrance doors - metal;
- Interior doors - MDF;
- Elevator - electric, with a luxury cabin.
The building offers garages and parking spaces for sale.
Construction time
Start of construction: February 2024.
Construction period: 2 years.
Buyer's commission: 3%