Solar power plant with capacity of 10 MW, the land is owned by the owner. The conditions for connection have been secured, the project documentation has been prepared, the approval of the Detailed Regulatory Plan is ongoing, thus the locations will be analyzed later in the urban development project. A valid building permit is expected by the end of 2024, more precisely until the aforementioned town planning procedures are implemented in accordance with the Law. Subject of the offer: sale of the legal entity, connection conditions, project documentation and valid building permit. Method of payment: advance 10% and phased payment or at the end upon receipt of a building permit. Turnkey construction.
*The service for developing a solar energy project from scratch is available, from obtaining a location to launching a power plant, as well as installing and launching batteries for storing BESS and more profitable sales of electricity.
Information about this accommodation could change, so we are not responsible for its accuracy. For exact specifications please contact us. Photos are symbolic. persons chrome extension:// efaidnbmnnnibpcajpcglclefindmkaj/https:// rudalle.ru/media/License_ru.pdf. Copying, reproduction, distribution, reprinting (in whole or in part), or other use of the material without written permission of the author is not permitted. Any violation of the author's rights will be prosecuted on the basis of international law.