The object code in the agency’s database: 469-922, Kiev highway, 21 km from the Moscow Ring Road, clean keys of the KP (Milyukovo). The house was booked on January 27, 2025. A new, qualitatively built house with a pool, in a stained co -preserved cottage village, clean keys. Passing study of functionality and ergonomics with a designer and planner of spaces. All furniture was new and was executed on order! Classic facade decoration, modern design repair using expensive natural materials. Excellent functionality of the house: 5 full -fledged bedrooms, one of which with its spacious dressing room and bathroom, a large pool with ozoning water and panoramic glazing, a sauna, a cinema, equipped with modern expensive equipment, a garage for 2 cars, a summer covered terrace with an excellent view of the forest. Central built -in vacuum cleaner. The land plot is 15 acres with a landscape: decorative and fruit trees and shrubs, a lawn, a large parking platform and paths with a beautiful paving and backlight are planted. House for guests or staff, barbecue zone.In the village, all central communications, own pond with a walking area and arbors, a large sports ground, a playground with a large playing complex, an elementary school. Building type: accommodated to/p. Pl. Houses 535KV.M., pl. site 15 hundred. Stage of readiness: furnished. Bedrooms: 5. C/nodes: 3. The number of s/nodes incomplete. Rooms of total: 7. Important options: pool (Simmer 8x3 m, 1-1.7 m depth, mosaic bowl, anti-tecks with power control and oxygen supply and gas recovery, underwater lighting, tributary ventilation with heating from gas, warm floors, heating water from gas. Cotle); sauna (with a panel from Himalayan salt); apartment for staff; terrace; fireplace; Covered car: 2; A cinema with a retractable screen and a gaming mezzanine for children. Windows: PVC double -glazed windows (two -chamber white (in some rooms, glazing from the floor), on the 3rd floor of the attic velux. The height of the windows in the pool is 2.62 m, in the living room and the dining room - up to 2.8 m). Year of construction at home: 2020.Roof: metal tile (insulation 4 layers (200 mm)).
1st floor: porch 3 sq.m, hall 27 sq.m, living room 28.5 sq.m with a fireplace + kitchen-dining room 26.5 sq.m with access to the summer terrace of 25 sq.m (with a beautiful view of the forest belt), pantry (under the stairs) 4 sq.m, garage (2a/m) 45 sq. M. Mm, boiler room. 11 sq.m, guest bathroom 3 sq.m, spa zone 88 sq.m with a pool (8x3m) and a sauna of 5.5 sq.m.
2nd floor: hall 11 sq.m, main bedroom 28 sq.m with a dressing room of 14 sq.m and a bathroom of 12.5 sq.m, a bedroom for boys 24 sq.m, a bedroom for a girl 22 sq.m, a total bathroom 7.5 sq.m with a bathroom ..
3rd floor: 10 sq. M, cinema 4K + cabinet (can be used as a bedroom) 50 sq.m with a gaming mezzanine for children, a living room 20 sq.m, a bathroom with a shower - Outlet 12 sq.m .. interior decoration: designer decoration in the style of modern classics, mainly in bright tones, using expensive materials. On the walls, decorative plaster (Venetian), in the bathrooms - porcelain tile, in the sauna of Gimalayan salt inserts.In the master spell and in the living room on the wall, a decorative panel made of wood. The flooring of the 1st floor is a porcelain tile with water heating, the 2nd floor is a parquet board, the attic is a high -class laminate. The railway staircase monolithic standard width, with backlight, marble steps (Crema Marfil, Italy), fencing - hardened glass. Suspended GCL ceilings curly with various backlighting. All plumbing GAPP is installed. All communications are diluted turnkey, Rehau pipes, steel radiators Kermi and designer tubular, where intra -floor convectors are installed from the floor. E/e legrand. Interior doors of wooden veneered (white), Legran front door. Marble window sills (white marble). The pool is finished with a mosaic, covered with a film .. Engineering support: The house has a Buderus gas boiler, a Buderus boiler for 200 liters of indirect heating and a multi -stage water purification system with ECVOLS electronic configuration. For the pool, a water ozonation system is installed (the best in the world for cleaning for today! Drinking water is obtained, no chemistry is used at all).A powerful anti-flow system, water bedspread (water in the pool +35C), a supply and exhaust air conditioning system. Such a pool is ideal for young children. Daikin air conditioning (in the living room, the main bedroom and on the attic floor in the cinema), in the pool forced supply and exhaust ventilation with pre-trial air (from a gas boiler) and a recovery (a device through which they pass without mixing, the output flows and the out-of-the-out air gives the warmth of the entry air). The central built -in vacuum cleaner HD Pure Cyclonic Cyclovac (Canada) was divorced at the house. Furniture, equipment: the house is completely furnished. The kitchen has new furniture from the GIULIA NOVARS studio with KupPersbusch household appliances. Chandeliers in all rooms, lamps with illumination along the stairs. All furniture is made to order (more than 20 million rubles), including a large sofa from the factory on March 8 .. Type of site: with trees and landscape.Landscaping of the site: Landscaping was performed: about 100 different trees, shrubs, thui are planted. \ nstatus of the Earth: lands of settlements for IZHS. Fruit trees (7-8 years old) were planted: apple trees, cherries, plums, blueberries, honeysuckle, mulberry. On the site of the lawn, pavers and large parking platform for 6 cars are paved with pavers. Street lighting on the house and on the site is divorced, lanterns are installed .. additional. Buildings: - auxiliary house ~ 100 sq.m (for staff and/or guests), 2x -storey frame on a column foundation - screw piles, furnished: hall, kitchen + living room, 4 bedrooms (one of them on the ground floor), 2 bathrooms (one on each floor, with shower).
- The aviary for the dog, the fence 3D steel with a warm booth.
- greenhouse .. communications:
GAZ - there is (trunk),
e/e - is (30 kW, 380V),
water supply - central,
Sewerage - centralized,
Protection - there is (checkpoint, you can install a signaling system).Infrastructure: In the village of the Primary School of the Catherine Lyceum and in 2024 the opening of a secondary school is planned. The school is half a panic, from the 1st grade 7 hours a week of English, and from the 2nd grade-Chinese, many sections (robotics, programming, drawing, choreography), and in a neighboring building a modern gymnastic hall, where the class of prize-winner of the Olympic Games holds. In the village of Bolshaya Subanated Public Territory with a pond, arbors and a multifunctional sports ground, a high -quality playground.