Residential complex in Varna, in a quiet and green place of Vinica district
Location
The complex is located in the Vinica area, in the upper part of the quarter, in its quiet and green part.
Modern facades, stylish design and green areas make the complex an ideal place for a new life and a home where every day is filled with peace and inspiration.
The complex offers a unique view of the sea and the city, combining modern architecture with natural beauty.
In the immediate vicinity are the equestrian sports base, Botanical Eco-park, modern medical center "Eurohospital".
Convenient access to all the beaches of the northern coast of the Black Sea, the nearest of which is Saints Constantine and Helena is only 3 km away.
Description of the property
The complex consists of two buildings - Building 1 and Building 2, with access control, superbly maintained common areas and rich landscape design. Both buildings are located in the central part of the site.
The two buildings of the complex offer 27 spacious apartments with 2 bedrooms, designed to provide maximum lighting, comfort and functionality.
The apartments are rented on a rough finish.
The complex provides 36 parking spaces in two underground parking lots, as well as the necessary number of parking spaces for people with disabilities. There are also 48 parking lots for bicycles.
On two underground levels, level -2 is implemented and underground parking lots are functionally connected with Building 2. The car approach is organized as follows: an entrance from the southwest, which leads to the street to enter the underground parking lot No. 2. Entrance from the north-east, from the street, on an open ramp through the territory of the site for the entrance to the underground parking lot No. 1.
Pedestrian access is provided as follows:
- For Building 1 from the northeast.
- For Building 2, from the southwest.
At least one accessible route is provided to the entrances of both buildings, which meets the requirements for an accessible environment.
Parking space in an underground parking lot - from 20,000 euros.
Duration of construction
December 2025: the building is already under construction, underground parking lots are built, the construction of the 1st floor begins.
Act 14 is scheduled for 31.08.2026, and the final completion of construction and commissioning of the entire complex is scheduled for July 2027.
Payment scheme
-20% - when signing a preliminary contract;
-70% on Act 14;
-10% - on Act 16
Commission from the buyer: 3%