Complex of new modern houses in Varna, Zelenika district
Location
The houses are located in Zelenika, 10-15 minutes drive from the center of Varna. The beautiful combination of nature and proximity to the center makes these homes ideal for families who value peace and quiet combined with urban amenities.
- Beach - 1 km
- Supermarket, 500 meters.
-Bus stop - 300 m
- School - 2 km.
- Railway station - 10 km
- Airport - 16 km
Description of the property
The complex consists of three namesake houses, each with a total area of 277 square meters. Bright houses have been designed, which will be built from high-quality materials and harmoniously fit into the green environment.
Facades of relief plaster and natural stone, the height of the interior decoration is 340 cm. High windows, spacious interior layout. An interesting solution is a separate floor on the first level, a garden with a separate entrance, suitable for a second household or additional premises (fitness, home cinema, tavern, etc.).
Monolithic reinforced concrete frame and brickwork, durable heat and waterproofing, preparation for solar panels, heat pump, the possibility of installing a fireplace on two floors, preparation for a large boiler with coils for solar energy and heat pump.
Complete appearance, fences from the street and neighbors, alleys and sidewalks.
The adjoining territory of each house, with an area of 380 square meters, is divided into two levels by retaining walls forming a terrace-veranda.
House layout
Independent floor at the basement level of the house with a warm transition if you want to allocate a separate household or as an option for an entertainment zone (billiards, home cinema, tavern, fitness, etc.). Height 2.60 m, living area 91 sq. m. Consists of: a large living room of 54 sq. m. (suitable for separation) with direct access to the lower level of the yard, stairs, room suitable for /warehouse, basement, sauna or other functions /, bedroom with access to the English courtyard, bathroom with toilet, engine room.
First floor, located on the upper level of the courtyard. Ceiling height 3.40 m, area 76 sq.m. Planning: hallway, spacious living room 38 sq.m. (including kitchen with dining room, recreation area, with the possibility of installing a fireplace), staircase, study-bedroom, bathroom with toilet, veranda 27 sq.m., parking for two cars with the possibility of installing a covered light structure, stairs to the lower level of the yard.
- Second floor. Ceiling height 3.40 m, area 110 sq.m. Planning: staircase, two separate spacious children's rooms facing south, with an adjacent spacious terrace, laundry room, corridor, bathroom with toilet, spacious and bright main bedroom of 20 sq.m. (with a dressing room, spacious bathroom with toilet, covered spacious terrace). Natural lighting in the corridor through the VELUX attic window.
Each house has 2 parking spaces.
Houses are rented out on rough finishes--
Degree of completion:
Ceilings - drywall on a frame of mineral wool, plastered and ready for painting.
- The walls are flat, plastered. The floors in the rooms and bathrooms are a cement screed.
- Electrical wiring - made according to the project, ready to install switches and sockets at the request of the customer. Possibility of change on an individual project.
Heating / air conditioning - preparation for a warm floor with a heat pump, cables, pipes and racks for external air conditioning units are laid.
Windows - PVC, 6-chamber REHAU, triple double-glazed, double-sided opening.
The roof is flat, pitched, insulated with extruded polystyrene 10 cm thick. A screed to protect two-layer waterproofing with a finishing layer of mineral crumb. Preparation for solar batteries and photovoltaic systems.
-Insulation of the facade - polystyrene foam 12 cm thick with a coating of elastic, resistant to aggressive media, vapor permeable and water-repellent silicate silicone plaster Ceresit. Elements of the facade will be finished with natural stone travertine.
- Hormann's front door.
- Electricity is 3-phase.
Fences on the external borders and boundaries of the site are built on an individual project.
- There are paths around the houses.
-Facade lighting.
Preparation for the installation of video surveillance of the yard and entrance.
Preparation for the installation of an automatic watering system.
Duration of construction
Construction permit from 13.08.2025.
15.11.2025 – Executed earthworks and laid concrete layer.
27.11.2025 – The foundations and backfilling were completed.
05.12.2025 - Laid overlap at the mark of -2.65 / semi-underground floor.