Apartments in a newly built residential building, Varna, Tsveten quarter
Location
Convenient location near the Dental University and Medical College, in an area with an elite language school, kindergartens, public transport stops and the Spartak Stadium, offering various sports events.
Description of the object
The building is distinguished by modern architecture and aesthetically combined facade materials, which creates a sense of elegance and coziness. The facade is designed using a combination of natural stone cladding and wooden elements, which emphasizes the purity of the lines and harmony with the environment.
The house has seven floors, including an underground level with garages and parking spaces. We offer two-bedroom, three-bedroom and one four-bedroom apartment. Large windows provide an abundance of natural light in the apartments, and spacious terraces offer a place to relax with views of the green areas of the area.
Apartments
The apartments are designed with different layouts to meet the needs of each client, including spacious living areas, functional kitchens and cozy bedrooms. Underground parking and separate garages guarantee convenience and safety for owners’ cars.
Apartments are rented on a rough finish:
internal walls - brick with plaster;
ceilings, drywall;
floor of the rooms - cement screed;
bathroom - toilet - floor - cement screed, walls - lime and cement plaster;
electrical wiring - fully executed wiring for switches, sockets, optical cable to the apartment;
plumbing work - performed to a fork;
laying pipe connections for installation of air conditioners in architecturally designated places;
external door - armored with a closed decorative frame;
High quality PVC joinery - 7-chamber triple glazing, 6 mm four seasons / 4 mm white float glass / 4 mm K.
Common parts of the building:
facade - a combination of plaster with stone, HPL and ceramics;
floors and steps of granite or porcelain;
walls - decorative plaster;
lift to ORONA;
Parking - polished concrete on the floor;
roof - hydro- and thermal insulation.
Duration of construction
The construction site opened in March 2025, Act 16 is scheduled for the end of June 2027.
Payment schemes
30% - when signing a preliminary contract;
20% - at the completion of the roofing of the fourth floor;
30% – when signing Act 14;
20% on signing Act 15.
Commission from the buyer: 3%