Newly built residential complex in the city of Burgas, in the Slaveykov residential complex
Location
The new building is being built next to Green Park 1, in close proximity to the Lidl store in the Slaveykov residential area, close to the main transport arteries in the direction of the city center, Sunny Beach resort, Sozopol and the highway to Sofia, as well as close to the shopping centers "Gallery" and "Plaza". There are also many schools, kindergartens, medical centers, bank branches, shops, establishments, bus stops in the area.
Property description
The building consists of sunny apartments – functional two-room and three-room apartments, with shops, underground and above-ground parking spaces and garages.
Construction characteristics
Facades:
External walls: 25 cm brick;
Insulation of brick walls with 10 cm foam plastic - Baumit;
Facade mesh, pasted with glue - Baumit;
Structural polymer plaster - Baumit;
Thermal insulation on concrete surfaces - XPS 10cm.
Common areas:
Staircase and common areas: granite tiles;
Walls and ceilings: gypsum putty and latex;
Railings - according to design;
Hydraulic lifts are installed;
Apartments (bedrooms, kitchens, dining rooms, living rooms and corridors):
Walls and ceilings: plastered with gypsum plaster with aluminum corner profiles for plaster;
Floors: cement screed;
Wet rooms: lime-cement plaster; floor - cement screed.
Balconies
Walls and ceilings with facade plaster, with installed lamps;
Floor: waterproofing and granite tiles;
Railings according to the project.
Windows: Five-chamber windows with energy-saving double-glazed windows “4 seasons”;
Window sills made of natural stone.
Doors: Burglar-proof entrance doors to the apartment;
Polypropylene water pipes /reinforced and insulated/.
Electrical installation
High-current electrical installation of lighting and sockets has been built;
Electricity meters have been installed;
Apartment electrical panel;
Switches and sockets have been installed;
Lights have been installed on the balconies;
Installation of a bell and intercom;
Internal installations for telephone, Internet and television.
Parking spaces and garages
Walls and ceilings: made according to the design;
Floor: polished concrete.
The price of an above-ground parking space is from 9,000 euros, underground parking spaces are from 12,000 euros.
Construction time
Start of construction - September 2023.
Construction time - 20 months.
February 2024: construction has reached the 3rd floor.
Payment scheme
Standard.
Flexible payment schemes are possible depending on the client's wishes.
No building support fee.
Buyer's commission: 3%