Newly built house of specific construction, in the elite area of Mala Ivanca, only 31.5 km from the center of Belgrade, on 9600 m2 of building land. The altitude of about 225 m.
Conceived as a business-residential building, with a total area of 500m2, plus warehouse space.
The business space is on the ground floor and consists of 250 m2 and a warehouse space of 60 m2 (three thermally insulated steel containers with garage roll-up steel doors connected to the building itself).
The ground floor can easily be converted into a living space if needed.
The residential part of the house is located on the first floor, the area is 250 m2, and the height of the rooms is 3.1 m. It consists of a spacious entrance area "wine bar", a large kitchen with a separate laundry room and access to the main yard, a huge unique living room with an auxiliary kitchen, a dining room with two living rooms, a guest toilet. En-suite with balcony, children's room with balcony. The huge living room also has two connected large exits (sliding doors) to the main terrace-courtyard.
Fully automated heating, gas underfloor heating. A strong fireplace.
Ferrobeton floors, new Mitsubishi inverter air conditioners, perfect thermal and hydro insulation of the entire house and roof. Branded windows with three panes, filled with argon, internal doors solid wood, white pine.
A hydraulic elevator connects the ground floor and the first floor.
It has a garage with a technical room and a summer dining room with a summer kitchen and barbecue.
It has an overflow pool of 10 x 3 m with a separate Jacuzzi tub for six people. There are 200 m2 of granite cobblestones around the pool.
A well-kept lawn of about 450m2 with a drip irrigation system, lavender seedlings and decorative trees of tame dredging.
The house was built as a modern "Smart house" with, complete video surveillance and alarm system.
All devices are controlled and activated via the Internet, mobile phones, and Amazon Alexa Home devices.
Sold with furniture, equipment, floor cleaners, robots and home maintenance tools.
The company and business part is charged separately according to the agreement.
Photos, videos and documents from the beginning of construction by phases are available.