This carefully designed complex, designed by experienced architects, covers a total area of 12.307 m2. Just 4-5 minutes from Budva, it offers the silence of a hidden valley with unique green areas and mountain views on all four sides. The location guarantees peace and quiet, while providing easy access to all the necessary amenities for a comfortable life. With a video surveillance system around the clock, a tennis court and a playground, a safe and ideal living space is created inside the complex for you and your loved ones.
The complex is divided into two stages:
Stage 1:
This stage consists of 4 stone villas, each with an area of 195 m2 (net area: 153 m2), with different plots of land: 737 m2, 854 m2, 785 m2 and 894 m2. The villas are built entirely of natural wood and stone. Each villa has an infinity pool (with a heat pump), which can be used all year round, a modern recreation area by the pool, a sauna, a bath, 4 air conditioners, a floor heating system, a fireplace, specially designed kitchen cabinets and countertops, an open garage for 2 cars, a laundry and separate bathroom in each bedroom. Construction began in May 2024 and will be completed in November 2025. All municipal fees associated with this stage have already been paid.
Stage 2:
The second stage includes 6 villas, 4 of which are duplexes, and a building with 12 apartments. The area of the villas ranges from 194 m2 (net area: 166.5 m2/duplex), 261 m2 (net area: 223 m2), 327 m2 (net area: 275.5 m2) to 206.5 m2 (net area: 175 m2/duplex), and the areas are 685 m2, 441 m2, 581 m2 and 730.5 m2. Each villa has a swimming pool that can be used in summer and winter (with a heat pump), a sauna, air conditioning, a floor heating system, specially designed kitchen cabinets and countertops, an open garage for 2 cars, a laundry room and a separate bathroom in each bedroom. The building with 12 apartments is located on a plot of 2.109 m2 and includes 6 apartments of 48 m2 (1+1), 3 apartments of 85 m2 (2+1) and 3 apartments of 109 m2 (3+1). The building has a private parking for apartment owners, two swimming pools (for adults and children) and a recreation area by the pool. The second stage, designed with more modern architectural lines, preserves the integrity of the project. Construction will begin in April 2025, and delivery is scheduled for November 2026.