Project Park Villa
Altintash / Aksu
Plot
Land 15441 / Share 4
Area
land: 4158 sq.m.
Consists of 4 blocks – A, B, C, D
2 residential
A, D – Zemin + 5 floors
2 blocks
type of villas B, C
---
Square
2 + 1 – 95 brüt / 70 net
1 + 1 – 65 brüt / 50 net
Two types of layout 1 + 1 – Loft –
- 90 m brüt / 75 net
- 100 net / 85 net
Villas 3 + 1
– 200 brüt / 185 net
Pool – 530 sq.m.
Children's pool – 35 sq.m.
-------
Features
complex
Total number of apartments – 48 pcs + 4 Villas
On each floor there are 4 apartments
1 + 1 – 2 pcs
2 + 1 – 2 pcs
-Underground
parking
-Lift ( from
block A, B is a descent into underground parking )
-In each block 2 stairwells
-Tennis
court
-Children's
playground
-Drunk
530 sqm. ( Adult, Baby )
-Drunk
children ( 35 sq.m. )
-Jakuzi ( capacity up to 10 people )
-Underground
parking ( one parking space )
-System
video surveillance
-Protection 24/7
-Fitness
-Spacenter
-Fire fire
100-TON WATER SYSTEM OF PROMOTION
--------
Features
apartments:
-Smart House System
- Floor heating in apartments 1 + 1 Loft
-Routine apartments 2 + 1, 1 + 1 – xps soundproofing
- Ceiling height 1 + 1, 2 + 1 - 2.85 m.
-Set ceiling at apartment 1 + 1 Loft – 6 m.
-Height of doorways – 2.30 m. LAKE brand, norm 2.10 cm
-In the bathroom, a glazed shower cabin 2.40 cm high ( 1.90 cm )
-American Kitchen
-LED Lighting
-Automatic window inserts
-In the hallway built-in wardrobe
-Water filter for apartments 1 + 1 Loft
- Mineral water system for apartments 1 + 1 Loft
-In every room air conditioning brand SIEMENS
-Spirit, stove, extractor brand SIEMENS
- SIEMENS dishwasher
- SIEMENS boiler ( each apartment has its own )
-Santhechnics of the GROHE brand ( Germany ), GEBERIT ( Switzerland ), DURAVIT ( Germany )
-HANSGROHE brand shower ( Germany )
-Ceramics brand ÇANAKKALE ( Turkey )
- PVC windows ALUMIL ( Greece )
---
-Out-off wall thickness along with insulation - 25 cm
-Inner wall thickness – 15 cm
-Instead of red brick Ytong aerated concrete blocks for thermal insulation
-Fasad made of glass wool + grid + plaster + coating
-Hypse grid used for crack resistance
-Cockwork performed by building mixtures of the WEBER brand ( Russia )
-WAVIN silent pipe system ( UK )
- KNAUF drywall suspended ceilings
-Hydroisolation on the walls and on the floor in the KOSTER bath ( Germany )
-In the bathroom there will be waterproofing on the walls and on the floor
- Heat and sound insulation of the floor
--------
Distance to:
Lara Beach – 5 km
To the airport – 500 meters
To Hospital – 5 km
shopping center Terra City – 8 km
To tram – 4 km
To school – 800 meters
-------
System
pay
There is a installment option
1 installment – 60%
The residual amount after completion of construction
Amount in
Tapu
2 + 1 – 85.000 $
1 + 1 – 750,000 tl
1 + 1 – Loft – 85.000 $
Object Delivery – November 2023.
Construction company serves the house 10 years after its delivery