Background:
• Territory: 18,404 m2
• Production facilities: 1405.3 m2
495.2 m2, 1480 m2, 195.9 m2, 20.8 m2,
907.1 m2, 979.8 m2, 74.9 m2.
• Main workshop: 1405.30 m2
• Communications: sewage, water, heating, electricity
Energy supply and resources:
• Solar panels produce 55 kW per hour
2 wells (160 m and 178 m, 10 t / h)
• Natural gas brought to the boiler
• Emergency generator: 100 kW
Boiler equipment:
• steam-boiler
• Economizer and gas drainage system
• Compliance with standards
Production:
• 3 cooking vats with infrastructure
• 16 vats with automaticity
• 2 mills (1 backup)
• 4 syrup vats
Reclamation unit:
• 4 columns: wild, epiration, alcohol, cleaning
• Deflegmators, coolers, automation
• Standby pumps
Storage and logistics:
• Chip shed
• Barda tanks: 1,200 tons
• Weights for freight transport
• 2 grain bunkers
• Asphalt area
Water treatment:
• Water purification and mitigation
• Use: rectification, cooling, boiler, household needs
Administrative premises:
• Office, laboratory, accounting
• Dining room, dressing rooms, bathrooms
• The locksmith
Infrastructure and security:
• Fence 3.5 m, video surveillance
• 2 entrances and additional exits
• Water reservoir: 100 tons
Transport:
• Forklift, trucks, trailers