"Botanic Residence" is the latest offering from the project “Botanic Family Resort” from the investors of "Azur Varna Resort", located near the sea, in a peaceful and healthy environment with plenty of greenery, fresh air, and a high level of safety for you and your children!Our goal to contribute to a better standard of living combines our vision for modern design, functional homes, rich ancillary infrastructure, and accompanying management and maintenance services for the territory and buildings.Sunny and cozy homes, tranquility, a natural park, and unparalleled clean air – this is what owners of apartments in Botanic Residence get.
It is located in the "Botanical Garden" area of Varna, in close proximity to the Ecopark and 7 km from the ideal city center. Excellent road infrastructure and public transport stops ensure easy accessibility to the complex.
KEY FEATURES
LOCATION
Botanic Residenceis located in the "Botanical Garden" area of Varna, in close proximity to the Ecopark and 7 km from the ideal city center.
The location of the complex provides easy and quick access to numerous nearby amenities - restaurants, cafes, sandy beaches, spa centers, numerous tourist attractions and sights of the city of Varna.
Description of the complex
"Botanic Residence" is a gated complex that combines four residential buildings with a total of 62 apartments and underground parking garages with charging stations for electric cars. The project concept aims to merge people and nature, creating the conditions for better social interaction in a comfortable and peaceful environment. Lush landscaping, rock gardens, an outdoor saltwater pool, and recreation areas guarantee you fulfilling moments with your family while simultaneously satisfying your need for privacy.
"Botanic Residence" follows the principle of "smart" construction with integrated management and control systems, high energy efficiency, and uncompromising quality of the materials used.
"Botanic Residence" is a project in which every element of the complex has been thought through down to the smallest detail.
Apartments
In the complex you will find a variety of apartments, such as sizes – 1 or 2 bedroomsand apartments with a private courtyard, as well as panoramic terraces and views of the sea and the eco-park. All the apartments have straight windows and are functionally designed with large spaces and private shapes for a more comfortable furnishing.
Underground parking spaces and garages
Spacious underground parking lots with direct elevator and staircase access to every floor, with designated parking spaces for people with special needs, stroller storage, and bicycle parkingand electric car charging stations.
To ensure comfort and tranquility, the movement of cars within the complex is limited.
Technologies
The construction of the "Botanic Residence" buildings uses first-class building materials and modern technologies, ensuring high energy efficiency, good heat exchange, clean air in the apartments and common areas, and significant savings in maintenance and operating costs.Our buildings are characterized by significantly lower operating costs, water and energy savings, reduction of harmful greenhouse gas emissions, higher levels of health, quality of life and safety for the building occupants.
Highlights of the complex for a better quality of life
All amenities in the immediate vicinity
Management and maintenance
For the owners in the complex will be provided professional management and maintenance of the complex's internal and external common areas by highly qualified professionals. The annual fee includes all ongoing costs: staff salaries, cleaning and supplies, landscaping and maintenance of adjacent areas, pool maintenance, snow removal from the building access roads, electricity costs for the common areas, elevator subscription service, ongoing facility maintenance, video surveillance, security, lighting, pest control, etc.
Deferred payment plan:
30% within a month upon signing the preliminary contract
20% December 2025
20% June 2026
20% June 2027
10% - September 2028
Completion of construction: September 2028