We offer for sale the Buškovské mlýn complex, originally called Bukowsky mlejn, which is located below the Buškovského rybníka dam on the Střeg road in the Czech paradise (near the famous Placanek Valley, Kost Fortress, 3.5 km). The brick building was rebuilt in the 1950s. now there is only a roof structure with the replacement of some load-bearing floor structures. Existing masonry structures were supplemented with new masonry, lined with lime plaster with surface treatment, room layout and staircase shape were partially refitted. The entire building is covered with new facade paint. It remains, but most of the windows are replaced by new windows in wooden frames with insulating double-glazed windows. The building completely replaced floors, tiles and tiles. acquired a very pleasant look thanks to facing brickwork and domestic and outside sandstone. located on the plain, the border of the & # 8212; stream, as well as a decorative lake. You can drive through a separate entrance from the road and the gate for pedestrians. The front door has an entrance door where we can find a separate place. Toilet, from the vestibule you find yourself in a large living room. From here, on the smaller stairs, we find ourselves in the planned dining room with kitchen. There are also bathrooms and toilets. A wooden staircase leads to the second floor, which is divided into 2 rooms with a private bathroom and 2 rooms (bedrooms) that can use the toilet and bathroom on the first or first floor. On the 2nd floor we welcome a smaller living room and a terrace with stairs to the garden + separate toilet when accessing the terrace. In the attic of the mill we will find another 5 rooms with a private bathroom. The mill building accommodates up to 32 people, offers the possibility of organizing public events, weddings, teamings, trainings, etc. D.
Current owners began the reconstruction of the three-story mill building (473 m2). and the surrounding area with a barn (135 m2) in 2018, and they intended to build a building for commercial use from another building (according to the Real Estate Cadastre). Change in the use of the building according to the project for the construction of a residential facility & # 8212; private housing will occur simultaneously with the approval process for construction. It is possible to retain VAT for & # 8212; VAT payer! Round-the-clock operation of construction is not planned (only outside the heating season, t.e. around April & # 8212; October). Staying in the winter months can be solved by installing direct heaters or radiating panels in separate rooms. Drinking water from the well is supplied to the mill building. Wastewater treatment is carried out by wastewater treatment plants (at the site & # 8212; until completion). The Bushkovsky pond adjacent to it, with an area of 5.9 hectares, is used to breed fish and belongs to the famous aristocratic family of Kinsky. The surroundings of the mill are very picturesque, Czech paradise offers entertainment for romantics, athletes, lovers of silence and fishing.