Apart from the hotel, there is an annex building in the plot and there is a total land usage area of 955m2. The hotel actively consists of 22 rooms and continues to serve with 42 beds. It operates for 12 months and the average summer and winter turnover is above the standards. There is no pool in the plot, architectural drawings have been made and the necessary permissions have been obtained and a pool can be built if desired.