A preliminary analysis of the plot allows for the construction of up to 5 semi-detached houses with a total area of about 247.5 m² each or 7 single-family houses with a minimum plot area of 500 m².
The plot provides for connections to electricity, water, gas, Internet (fiber optics), and the sewerage system is planned for completion by the end of 2025. The plot is located in a quiet area next to a forest, close to the Vistula River, with convenient access to bicycle routes leading to the center of Warsaw and Modlin.
]]>