Interior
Features of the object
The location is chosen taking into account walking accessibility. The object is located 8 minutes walk from the sea, at the same distance from the district road, the distance to the nearest store is 4 minutes walk, to the nearest school - 5 minutes walk. 15 minutes to the airport, 20 minutes to the city center, 15 minutes to the nearest hospital
1+1 2+1 2+1 Lower duplex 2+1 Upper duplex 3+1 3+1 Lower duplex 3+1 Upper duplex 4+1 Lower duplex 4+1 Upper duplex
Infrastructure of closed public areas: indoor pool, massage rooms, sauna, steam room, hamam, fitness club, restaurant, indoor projection cinema, indoor children's park, conference hall Open public areas: swimming pool of 250 m2, football field, tennis court, outdoor children's park, outdoor sports ground
All household appliances of class A +, Beko In all apartments garberobe, built-in kitchen appliances In all duplexes electric-water warm floors (heat pump is not included in the price) In 1+1 apartments, air conditioners are included in the price, in other apartments only the base for installing air conditioners.
1. The possibility of free use in apartments and public areas of hot water heated by solar energy.
2. Building materials and electrical appliances are environmentally friendly Class A materials.
3. The landscape design of park areas is provided with a rich variety of colors and green spaces.
4. A heating system will be installed in each apartment. A resistant closed (pressure) solar heater system with enameled tanks will be installed.
5. 24-hour security and security cameras. 7/24 video cameras with night vision in an amount that allows observation of the entire territory of the complex, completely eliminating blind spots. The devices will be installed in sufficient numbers in the watchman's booth, all camera recordings will be recorded.
6. Hybrid grass (zoysia japonica) will be used for lawns.
7. 4- Large balconies (except French and bedroom balconies)
A water tap and an electrical outlet are installed.
8. 5- A generator will be installed capable of providing a power equal to at least half for apartments and common areas. The generator will be a well-known company such as aksa, Genpower, etc., new, with a warranty and with a document of the Institute of Standardization of Turkey (hereinafter: IST).
9. 6- The exterior and inter-apartment walls (common walls separating apartments) will be made of 19-thick insulacinous bims bricks (cwbims), the interior walls of 10 or 13.5 bricks, plastered and painted. For internal walls will be used plastic semi-matted paint company Filli
10. All ceilings are hinged from drywall, except ceilings on balconies (closed public places, apartments, staircases). Depending on the design project in the salons, halls and all rooms there will be hinged ceilings of gispoboard with spot lighting or with LED tape.
11. The ceilings in the bathrooms will be of drywall, installed sinks and showers made of glass by Hüppe, with an aluminum body 6 mm thick. A bathroom closet has been installed. Manufacturer Vitrifiye Vitra or Grohe. Water reinforcements of Artema, Vitra, Grohe. In bathrooms and toilets will be installed hidden in the stent tank brand Vitra, Grohe.
12. An underground water storage tank will be installed to meet the weekly water requirement. The tank will be with hygienic insulation, ceramic coating and hydrophore. With a warranty and IST document.
13. For windows, aluminum thermal insulation window profiles of Kleidco are used. The accessories will be used by Roto. Double-glazed windows of comfort company. At the exits to the balcony from the hall and other rooms, sliding doors will be installed. In the large halls of duplex apartments for frames of more than 4 meters (22 in total, buildings A, B, C), the Hebe Schiebe glazing system will be installed.
14. In duplexes on the lower floors on the outside will be installed automatic shutters under the color of wood with a panel of sheet metal.
15. In duplexes located under the roof on the upper floors, rough plaster will be used on the walls. The roof will be covered with sheet iron, on the sides and bottom of the cornice gutters with a coating of sheet iron or Boardex.
16. Air conditioning will be installed in all apartments.
17. Parking, located under buildings A and B, will be carried out in accordance with the project plan.
18. For all apartments, a depot of 3 m2 will be made.
19. Entrance doors will be made of metal 1st grade firm sur or bordo. Interior doors with lacquered acrylic coating cnc.
20. Kitchen cabinets and casings of garberobes made of mdf, with lacquered acrylic coating.
21. Elevator with a capacity of 10 people, with a European certificate of conformity.
22. Exhaustive infrastructure in public areas with full installation of stationary and mobile furniture (fitness club, indoor pool, sauna, steam room, Turkish hammam, massage room, heating room, cinema, music room, conference room, cafe-bar-restaurant, children's game room, games Playstation, table tennis, table football, air hockey, etc.).
23. A central satellite television and internet system will be installed. Satellite dishes have been installed. Television, Internet and telephone cables were installed in each room.
24. Intercoms with video surveillance and screens will be installed. There will also be a connection with the apartments from the watchman’s booth and his apartment.
25. A central water purification system will be installed in the complex.
26. A floor heating system will be installed in duplexes. A place will be prepared for a heat pump without installing the latter.
27. In all apartments in bathrooms and toilets will be installed productive floor heating system Devi.
28. Entrances and park areas will be built taking into account the needs of people with disabilities.