This modern apartment project will be located within one of the most distinctive complexes in the Caribbean “VISTACANA”, with 1, 2 and 3 bedroom apartments, where you can enjoy spaces designed especially for you with views of Grand Central Park.
Integrating an exclusive Hotel Lobby and 4-level buildings with state-of-the-art elevators, staying at the forefront of the market by adding value to its architecture along with a vibrant and distinctively Caribbean atmosphere.
Located 10 minutes from Punta Cana International Airport in the Dominican Republic, 5 minutes from the most beautiful beaches with turquoise waters in the Caribbean and 15 minutes from the first and only theme park in the Caribbean “Katmandú Park”.
We are inspired by a lifestyle that promotes good living in harmony with nature, seeking to ensure that residents can enjoy a pleasant environment, adhering to the principle of respect and fraternity.
Amenities:
• Park Sauna & Spa
• Pets Friendly
• Green spot for electric vehicle charging
• Grand Central Park
• The Woods Restaurant
• Garden Cigar with furnished and air-conditioned billiards
• Pool Lounge and Solaris Desk
• Run & Play Kids Park
• Coworking Space
• Gym
Finishes:
• Smooth finish on walls (certain restrictions apply)
• General porcelain floors
• Imported ceramics in bathrooms
• Plaster ceilings and cornices
• Engineered doors and closets in precious wood
• Modular kitchen cabinets, with natural granite top and blacksplash
Project Features:
Gated project with 24/7 security.
• 4-level building with state-of-the-art elevators and full power plant.
• Electric gate and audio intercom with digital access control
• 2 drinking water pumps (one for continuous use and one for emergency use)
• Appliances and air conditioning included in all apartments
• 9 apartment models to choose from
Prices from US$93,500. Up to US$205,000.-
Footage from 52m2 to 128m2
Payment method:
Set aside 10% of the unit, for reservation and contract
40% → To be completed in September 2024
Down payment (during construction)
50% → Final payment in November 2024
Upon delivery of your unit
Start of work → August 2023
Delivery date: November 2024
Amenities