On the site, the foundation is 12/12 meters (on the inside), basement, width 80 cm., height above the ground 60 cm., foundation depth 80 cm. The boiler room for water, with a volume of 15 cubic meters, was dug and cemented, and the electricity was discharged. There is a metal tool house.