The site is already completely removed and well-groomed (confirmation of the construction control of the adharge of the coastline, increasing the level of earth, cleaning, cutting trees and bushes). There are no existing buildings on the land plot, the relief is a plain, easement on the access road.
The allowed use of a land plot:
is currently a land plot in the area of forest -park buildings and on the territory of partial plantations.
the land can be acquired in the current state, and also consider the possibilities of carrying out the separation, taking into account the interest of the client.
communications:
electricity- there is a connection and a counter (20A /3 phases) is installed;
water-no (there are no centralized networks nearby); It is planned to bring urban water, but this can be done over the next year, it is possible to build a spoke or well;
sewage- no (there are no centralized networks nearby); It is possible to build a local, depending on the type, which is preferred, cesspool or biological;
gas-no connection (a gas pipeline is running along the batzer street), and there is also a direct gas pipeline.
of encumbrance:
5 m Protective strip (286 m2) of the air line 0.4 kW submitted an application for movement for moving on the movement Distribution networks for the ground;
Big Baltors' twist - 10 m (705 m2);
300 m Protective strip of Big Baltors.