Great location. Walking distance is the Neman River, a forest. Developed transport interchange. Nearby is the exit to the M 6 highway. The center of Grodno is 10 minutes by car. Convenient asphalt access road almost to the site itself. (200m gravel). Pines grow on the front side of the house, and at the end of the site there is a birch grove. In fact, only two neighbors to the left and right of the site. There is a city bus.
House 1-storey, 2 bedrooms, sauna, relaxation room, large terrace. The project was thought out with a division into family and guest areas. The emphasis is on a living room combined with a kitchen. The living room has many windows for access to light. From the kitchen and lounge there are exits to the terrace. Terrace 30 squares. A heated font with water filtration and air massage is mounted on the terrace.
The degree of readiness of the house is 90%. External wall material — red ceramic brick 2.1 NF manufactured by LSR (RAUF), partitions — full-bodied red ceramic brick, roof — modular metal tiles, monolithic foundation to a depth of 1800 with support 600 mm wide. Windows in PVC house with profile 80 mm, double-glazed windows 48 mm energy-saving. All windows are mounted with insulation (mineral wool) removed to the area.
Entrance door is metal with thermal break. Overlap—monolithic slab.
Larch overhangs.
Facade in the area of the porch and terrace made of larch. Larch terrace and porch enclosure. The floor on the deck board terrace is larch.. Filling the fence between larch posts. All larch is sanded and painted in two layers with OSMO paint.
Floor on porch made of porcelain stoneware 20 mm thick. on adjustable supports (will never get away from frost) Base, support posts and fence posts made of TERCA clinker brick.
The entire facade (with the exception of the porch and terrace) is made of hand-formed brick (treated with a water repellent - protective impregnation). For insulation, PAROC cotton wool with a cached top layer, connections between the main wall and stainless steel facing bricks, and a 40 mm vent gap were used. The walls are plastered to lighthouses. A rough screed is poured (reinforcement with a mesh 150*150 diameter 4 mm) Electric recoil gates.
The foundation was poured for the farm. buildings with a barbecue area, there are also bricks for the construction of walls (2.1 NF LSR), a base made of Terca clinker brick is laid and there is a facade facing brick.
All communications in the village are central.
Electricity has been installed in the house and distribution has been done throughout the house.
The water supply is installed in the house. Sewer — is distributed throughout the house and connected. Gas 5 meters from the site. It is possible to connect to storm drains.
The house was commissioned in December 2023.