Warehouse 164 m² in zyablikovo-district, Russia

Russia, southern-administrative-okrug, zyablikovo-district
Archive cost €574,122
Sold or out of date
Updated at: 22/04/2021

Location

Country: Russia
State: Central Federal District
City: southern-administrative-okrug

Building parameters

Number of floors: 3

Property parameters

Floor: 1
Total area: 164 m²

Description

Lot number: 3480057, Offer without commission. Sale of storage space. Moscow's only industrial complex of high-tech premises in the Light Industrial format with a fenced protected area, spacious parking and a thoughtful concept. Installment of 0% to 18 months The buildings were built, communications are being laid and raised, and the territory is being landscaped. The structural diagram of the building is a frame-wall system with the support of floors on monolithic railway columns and walls. The ceiling height in all buildings is 4.90 m on the 1st floor and 3.40 m on the 2nd and 3rd floors. The load on the floor of the 1st floor is 2000 kg/m2, on the floor of the 2nd floor 600 kg/m2, on the floor of the 3rd floor 400 kg/m2. By the time the Premises are handed over to the Buyer (signing of the acceptance certificate under the Main Agreement), the Seller shall perform the following works in relation to the Building and the Premises: - foundations of the Building: monolithic railway slab, thickness - 250 mm, without a floor bracing device; - floors: monolithic railway slab, thickness 200 mm; floor bracing is not performed; - roof: flat, not operated by cast-in-situ floor slab, thickness - 200 mm; - external walls: mounted metal sandwich panels filled with mineral wool slabs 150 mm thick; - entrance doors to the Building: metal, bipartite, external, blind, size 1400 x 2100 mm; - internal walls: masonry from a full gas silicate block with a thickness of 200 mm; - internal partitions: not performed; - ceiling finishing: not performed, ground concrete; - power supply: at the rate of 80 W per 1 sq.m. of the Premises (the entrance board to the Premises is installed by the Buyer independently at its own expense); temporary lighting is performed, but the Buyer performs the connection at his own expense; - water supply to the CFS - 3.25 m3/day; water supply meter, floor water supply and wiring shall be purchased and installed by the Buyer independently at his own expense; - water disposal K1 - 1.79 m3/day; installation of riser K1 D100; - ventilation: ventilation system ducts for s/s, without installation of fans; - heating: installation of heating devices; on the ground floor, part of the heating load is compensated by air-heating units of the Vulcan type. Steel panel radiators are used as heating devices. More information by phone.

Location

Russia, southern-administrative-okrug, zyablikovo-district