Building a warehouse
D. Hairdryer, Fanipolsky s / s, Dzerzhinsky district, Minsk region
Area: 9990 m2
Land. plot: 2.7 ha ( permanent use )
The buyer does not pay for the services of a real estate organization!
One-story building with a second light:
Warehouses - 9630 m2
Administrative premises - 2 blocks of 180m2
The building is raised relative to the level of asphalt by 1.2 meters. Asphalted ( or concrete ) rotary-unloading platform 30 m wide along the entire facade of 180 m.
Circular passage around the building. Designed 7 gates ( maybe more ). Heating – gas boiler room. Power supply – 630 kW. Improvement, barriers. Finishing all rooms, installation of plumbing. adjoins an additional 0.7 ha section, which can be used for the open storage of goods and raw materials, parking of transport.
The completion date of construction is – September 2022.
,
Short number ( MTS, A1, Life ): 7-800